# ERCOT Interconnection Queue Scraper (`jungle_synthesizer/ercot-interconnection-queue-scraper`) Actor

Texas grid generator interconnection queue from ERCOT's monthly report: project, fuel, MW, county, study and agreement dates, status.

- **URL**: https://apify.com/jungle_synthesizer/ercot-interconnection-queue-scraper.md
- **Developed by:** [BowTiedRaccoon](https://apify.com/jungle_synthesizer) (community)
- **Categories:** Business, Real estate, Other
- **Features:** Limited permissions
- **Stats:** 2 total users, 1 monthly users, 100.0% runs succeeded, 0 bookmarks
- **User rating**: No ratings yet

## Pricing

from $0.80 / 1,000 record scrapeds

This Actor is paid per event. You are not charged for the Apify platform usage, but only a fixed price for specific events.
Since this Actor supports Apify Store discounts, the price gets lower the higher subscription plan you have.

Learn more: https://docs.apify.com/actors/running/actors-in-store.md#pay-per-event

## What's an Apify Actor?

An Actor is a serverless cloud program that runs on the Apify platform. It has two run modes.
In Batch mode, an Actor accepts a well-defined JSON input, performs an action which can take anything from a few seconds to a few hours,
and optionally produces a well-defined JSON output, datasets with results, or files in key-value store.
In Standby mode, an Actor provides a web server which can be used as a website, API, or an MCP server.

Apify vocabulary and the platform model are defined once, in the agent quickstart at https://apify.com/agents.md.

## How to integrate an Actor?

If asked about integration, you help developers integrate Actors into their projects.
You adapt to their stack and deliver integrations that are safe, well-documented, and production-ready.

Do not guess an integration path. Every one of them is in the agent quickstart at https://apify.com/agents.md: the Apify MCP server, Agent Skills with the Apify CLI, the JavaScript and Python clients, the REST API, and the account-free path for an agent with no human to sign in. It also carries the rule on stating cost before the first paid run.

For examples already wired to this Actor's own input schema, see the [API](#api) section below.

Each client library has reference documentation the quickstart does not restate: [JavaScript/TypeScript](https://docs.apify.com/api/client/js/docs.md) (`npm install apify-client`) and [Python](https://docs.apify.com/api/client/python/docs.md) (`pip install apify-client`).

# README

## ERCOT Interconnection Queue Scraper

Get the Texas grid's generator interconnection queue from [ERCOT](https://www.ercot.com) as a clean table. Returns about 2,000 projects per monthly report: queue ID, fuel, capacity in MW, county, developer, study milestones, projected COD and status.

***

### ERCOT Interconnection Queue Scraper Features

- Returns every large and small generator project ERCOT tracks, with its INR queue number.
- Filters by fuel type: solar, wind, battery storage, gas, nuclear, coal, biomass, hydro.
- Separates active projects from inactive ones and from projects cancelled during the report month.
- Carries the full milestone trail: screening study, full interconnection study, interconnection agreement, energization.
- Reads up to 12 monthly reports in one run, so you can see how a project's status moved from month to month.
- Dates come back as `YYYY-MM-DD` and capacity as a plain number. No spreadsheet cleanup, which is the point.

***

### Who Uses ERCOT Queue Data?

- **Energy developers** — Check who else is queued at the substation you are eyeing.
- **Battery storage investors** — Track the storage pipeline by county and by CDR zone, and see which projects already hold an interconnection agreement.
- **Utilities and transmission planners** — Feed projected COD and capacity into load and resource models, or at least a spreadsheet that is not copied out of a PDF.
- **Analysts and journalists** — Count what is actually being built in Texas against what is merely requested.
- **Lenders and equity researchers** — Screen counterparties by study phase and financial security status.

***

### How ERCOT Interconnection Queue Scraper Works

1. Pick a fuel type, a status, and how many monthly reports to read. All three are optional.
2. The scraper reads ERCOT's published Generator Interconnection Status report for each month you ask for.
3. Each project comes back as one row with its report month, so rows from different months line up and compare cleanly.

***

### Input

```json
{
    "maxItems": 100,
    "fuelTypes": ["battery"],
    "statuses": ["active"],
    "reportsBack": 1
}
```

| Field         | Type    | Default | Description |
|---------------|---------|---------|-----------------------------------------------------------------------------------------------------------|
| `maxItems`    | integer | 100     | Maximum number of queue records to return. |
| `fuelTypes`   | array   | all     | Only projects of these fuel types: `solar`, `wind`, `battery`, `gas`, `nuclear`, `coal`, `biomass`, `hydro`, `other`. |
| `statuses`    | array   | all     | `active`, `inactive`, or `cancelled` (cancelled by the developer during the report month). |
| `reportsBack` | integer | 1       | Monthly reports to read, newest first (1 to 12). One is the latest queue snapshot. |

***

### ERCOT Interconnection Queue Output Fields

```json
{
    "iso": "ERCOT",
    "queue_id": "15INR0064b",
    "project_name": "Harald (BearKat Wind B)",
    "project_status": "active",
    "size_category": "Large",
    "study_phase": "SS Completed, FIS Completed, IA",
    "fuel_type": "wind",
    "technology": "WT",
    "capacity_mw": 162.1,
    "county": "Glasscock",
    "cdr_zone": "WEST",
    "poi_name": "59903 Bearkat 345kV",
    "interconnecting_entity": "McCrae Wind Energy II, LLC",
    "screening_study_started": "2013-11-27",
    "screening_study_complete": "2014-01-27",
    "fis_requested": "2014-04-15",
    "fis_approved": "2017-09-27",
    "economic_study_required": false,
    "ia_signed": "2018-05-30",
    "financial_security_posted": true,
    "projected_cod": "2026-12-03",
    "approval_for_energization": "2020-02-10",
    "approval_for_synchronization": "2020-05-12",
    "report_month": "2026-10",
    "report_posted": "2026-11-02"
}
```

| Field                          | Type    | Description                                                                          |
|--------------------------------|---------|--------------------------------------------------------------------------------------|
| `iso`                          | string  | Grid operator, always `ERCOT`.                                                       |
| `queue_id`                     | string  | ERCOT interconnection request number (INR).                                          |
| `project_name`                 | string  | Project name as ERCOT lists it.                                                      |
| `project_status`               | string  | `active`, `inactive` or `cancelled`.                                                 |
| `size_category`                | string  | `Large` or `Small` generator.                                                        |
| `study_phase`                  | string  | ERCOT study phase, for large generators.                                             |
| `fuel_type`                    | string  | `solar`, `wind`, `battery`, `gas`, `nuclear`, `coal`, `biomass`, `hydro` or `other`. |
| `technology`                   | string  | ERCOT technology code, such as `PV`, `WT` or `BA`.                                   |
| `capacity_mw`                  | number  | Capacity in MW. Repowering projects report net change and can be zero or negative.   |
| `county`                       | string  | Texas county.                                                                        |
| `cdr_zone`                     | string  | ERCOT CDR reporting zone.                                                            |
| `poi_name`                     | string  | Point of interconnection location.                                                   |
| `interconnecting_entity`       | string  | Developer or entity requesting interconnection.                                      |
| `screening_study_started`      | string  | Screening study start date. Large generators only.                                   |
| `screening_study_complete`     | string  | Screening study completion date. Large generators only.                              |
| `fis_requested`                | string  | Full interconnection study request date. Large generators only.                      |
| `fis_approved`                 | string  | Full interconnection study approval date. Large generators only.                     |
| `economic_study_required`      | boolean | Whether an economic study is required. Large generators only.                        |
| `ia_signed`                    | string  | Interconnection agreement signed date.                                               |
| `financial_security_posted`    | boolean | Whether financial security has been posted.                                          |
| `projected_cod`                | string  | Projected commercial operation date.                                                 |
| `construction_start`           | string  | Construction start date. Large generators only.                                      |
| `construction_end`             | string  | Construction end date. Large generators only.                                        |
| `approval_for_energization`    | string  | Date approved for energization.                                                      |
| `approval_for_synchronization` | string  | Date approved for synchronization.                                                   |
| `inactive_date`                | string  | Date the project went inactive. Inactive projects only.                              |
| `cancelled_date`               | string  | Date the developer cancelled. Cancelled projects only.                               |
| `report_month`                 | string  | Month of the ERCOT report the row comes from (`YYYY-MM`).                            |
| `report_posted`                | string  | Date ERCOT posted that report.                                                       |
| `source_url`                   | string  | ERCOT's download link for that report.                                               |

Inactive and cancelled rows carry the fields ERCOT publishes for them: name, fuel, capacity, county, size category and the status date.

***

### FAQ

#### What data does the ERCOT Interconnection Queue Scraper return?

The ERCOT Interconnection Queue Scraper returns one row per generator project in ERCOT's monthly interconnection status report. That is roughly 1,750 active projects, plus the inactive list and the projects cancelled that month.

#### Does it include large-load interconnection requests?

No. The ERCOT Interconnection Queue Scraper covers generation only. ERCOT does not publish a large-load queue as a dataset, so there is nothing to collect there yet.

#### Can I filter by fuel type or county?

The ERCOT Interconnection Queue Scraper filters by fuel type and project status. County is a column on every row, so a county filter is one line in whatever you load the data into.

#### How current is the data?

The ERCOT Interconnection Queue Scraper reads ERCOT's latest published monthly report, which ERCOT posts in the first days of each month. Set `reportsBack` higher to read earlier months.

#### What do I put in to get the queue?

The ERCOT Interconnection Queue Scraper takes a fuel filter, a status filter and a month count, all optional apart from `maxItems`. The default is the latest monthly snapshot.

***

### Need More Features?

Need extra fields, a different filter, or another grid operator? [File an issue](https://console.apify.com/actors/issues) or get in touch.

### Why Use ERCOT Interconnection Queue Scraper?

- **Complete** — Every project ERCOT reports, large and small, active, inactive and cancelled.
- **Comparable across months** — Each row carries its report month, so a status change between two reports is a diff, not an investigation.
- **Analysis-ready** — Typed dates, numeric MW and normalised fuel names, so the first thing you do with it is not cleaning it.

# Actor input Schema

## `sp_intended_usage` (type: `string`):

What will this data feed? E.g. lead lists, KYB checks, price tracking.

## `sp_improvement_suggestions` (type: `string`):

Provide any feedback or suggestions for improvements.

## `sp_contact` (type: `string`):

We'll personally help with your use case. No spam.

## `maxItems` (type: `integer`):

Maximum number of queue records to return.

## `fuelTypes` (type: `array`):

Only projects of these fuel types. Leave empty for every fuel.

## `statuses` (type: `array`):

Active projects, inactive projects, or projects cancelled in the report month. Leave empty for all three.

## `reportsBack` (type: `integer`):

How many monthly ERCOT reports to read, newest first. 1 is the latest queue snapshot; more months add each project's earlier status.

## Actor input object example

```json
{
  "sp_contact": "Share your email here...",
  "maxItems": 100,
  "reportsBack": 1
}
```

# Actor output Schema

## `results` (type: `string`):

No description

# API

You can run this Actor programmatically using our API. Below are code examples in JavaScript, Python, and CLI, as well as the OpenAPI specification and MCP server setup.

## JavaScript example

```javascript
import { ApifyClient } from 'apify-client';

// Initialize the ApifyClient with your Apify API token
// Replace the '<YOUR_API_TOKEN>' with your token
const client = new ApifyClient({
    token: '<YOUR_API_TOKEN>',
});

// Prepare Actor input
const input = {
    "sp_contact": "Share your email here...",
    "maxItems": 100
};

// Run the Actor and wait for it to finish
const run = await client.actor("jungle_synthesizer/ercot-interconnection-queue-scraper").call(input);

// Fetch and print Actor results from the run's dataset (if any)
console.log('Results from dataset');
console.log(`💾 Check your data here: https://console.apify.com/storage/datasets/${run.defaultDatasetId}`);
const { items } = await client.dataset(run.defaultDatasetId).listItems();
items.forEach((item) => {
    console.dir(item);
});

// 📚 Want to learn more 📖? Go to → https://docs.apify.com/api/client/js/docs

```

## Python example

```python
from apify_client import ApifyClient

# Initialize the ApifyClient with your Apify API token
# Replace '<YOUR_API_TOKEN>' with your token.
client = ApifyClient("<YOUR_API_TOKEN>")

# Prepare the Actor input
run_input = {
    "sp_contact": "Share your email here...",
    "maxItems": 100,
}

# Run the Actor and wait for it to finish
run = client.actor("jungle_synthesizer/ercot-interconnection-queue-scraper").call(run_input=run_input)

# Fetch and print Actor results from the run's dataset (if there are any)
print(f"💾 Check your data here: https://console.apify.com/storage/datasets/{run.default_dataset_id}")
for item in client.dataset(run.default_dataset_id).iterate_items():
    print(item)

# 📚 Want to learn more 📖? Go to → https://docs.apify.com/api/client/python/docs/quick-start

```

## CLI example

```bash
echo '{
  "sp_contact": "Share your email here...",
  "maxItems": 100
}' |
apify call jungle_synthesizer/ercot-interconnection-queue-scraper --silent --output-dataset

```

## MCP server setup

```json
{
    "mcpServers": {
        "apify": {
            "type": "http",
            "url": "https://mcp.apify.com/?tools=fetch-actor-details,jungle_synthesizer/ercot-interconnection-queue-scraper"
        }
    }
}
```

The hosted server signs you in with OAuth on first connect, so no API token belongs in this config. Clients without OAuth support can send an `Authorization: Bearer <APIFY_API_TOKEN>` header instead, using a token from API & Integrations in Apify Console (https://console.apify.com/settings/integrations).

## OpenAPI specification

Download the OpenAPI definition: https://api.apify.com/v2/actors/8acOVysJ0sN5mtdQT/builds/LALDQm5YI4xvqDrdf/openapi.json