US Power Plant Expansion & Retirement Pipeline avatar

US Power Plant Expansion & Retirement Pipeline

Pricing

$9.00 / 1,000 unique generator returneds

Go to Apify Store
US Power Plant Expansion & Retirement Pipeline

US Power Plant Expansion & Retirement Pipeline

Official EIA-860M and EIA-860 generator inventory: planned, operating, retirement-announced and retired units. Deduplicated by plant and generator; nameplate MW; JSON/CSV.

Pricing

$9.00 / 1,000 unique generator returneds

Rating

0.0

(0)

Developer

AFK Digital

AFK Digital

Maintained by Community

Actor stats

0

Bookmarked

2

Total users

1

Monthly active users

22 days ago

Last modified

Features

Limited permissions

Share

Find generator-level planned additions, operating units with reported retirement plans, and retired generators from official public EIA files. Results are one row per (plant_id, generator_id). A plant can contain many generators; capacity_mw is generator nameplate MW, never a plant aggregate or net summer capability.

Sources and precedence

At run time the Actor selects the latest accessible EIA-860M monthly workbook from EIA's published listing, with a recent-month direct-file fallback if the listing is temporarily unavailable. It reads Operating, Planned and Retired tabs (including Puerto Rico), and combines them with the latest accessible annual EIA-860 ZIP from a preceding reporting year (Plant and Generator sheets). Monthly wins for the same plant_id + generator_id, even if a unit changed status; annual supplies only missing units and plant city lookup. The source_period and source_url on every row identify the winning generator source. Annual city join is keyed by plant ID, never fuzzy name. Missing city is left as state only. Canceled/postponed projects are excluded. Retired monthly records cover retirements since 2002; annual-only older retired rows can appear.

EIA-860M labels operating codes OP (operating), SB (standby/backup), OS (out of service, not expected back next calendar year), and OA (out of service, expected back next calendar year). Proposed codes include P (planned before regulatory approval), L (approval pending), T (approved), U/V (construction at or below/above 50%), and TS (construction complete, pre-commercial). The Actor preserves these codes and source descriptions. Retired rows have RE and an actual retirement month; a planned retirement month on an operating row does not turn it into a retired unit.

The monthly data are preliminary, and EIA states that reported capacity is an estimate, not a commitment. Planned operation and retirement dates are month precision and may change. They do not establish a final investment decision, procurement, tender, sale or firm retirement commitment.

Official sources: EIA-860M, EIA-860, EIA reuse. Source: U.S. Energy Information Administration (monthly release date shown on source page). EIA does not endorse this Actor.

Input

  • state: two-letter state or PR.
  • energySource: EIA primary energy source code such as SUN, WND, NG, MWH.
  • status: planned, operating, retirement_announced (operating units with a planned retirement month), or retired.
  • minCapacityMw: minimum generator nameplate MW.
  • plannedDateFrom/To: inclusive YYYY-MM bounds on planned operation for planned rows or planned retirement for operating rows. Retired rows have no planned date; use status=retired without these filters.
  • operatorName: case-insensitive substring.
  • maxResults: 1–1000, default 25. Sample TX planned >=100 MW, 5 results.

The default dataset exports JSON and CSV through Apify's Dataset UI/API; no duplicate output is pushed. Each row includes status_code and status_detail (EIA source status where available), actual_retirement_date for retired rows, and the requested identifiers, generator data, dates, location and provenance. The SUMMARY key-value record reports source periods, counts and charges.

Pricing

Pay per event: $0.009 for each delivered unique generator (9 USD/1,000). Source duplicates, filtered records, download attempts and plant lookups have no result event charge. maxResults and Apify's run max-charge limit cap output. Infrastructure costs follow the Store pricing panel. No EIA API key required. Downloads are bounded to 65 MB/file, ZIP members to 30 MB, with retry and a processing deadline. EIA's public files may be temporarily unavailable; the run fails clearly instead of billing empty or invented records.