US Power Plant Pipeline (EIA-860M Generators) avatar

US Power Plant Pipeline (EIA-860M Generators)

Pricing

from $4.00 / 1,000 results

Go to Apify Store
US Power Plant Pipeline (EIA-860M Generators)

US Power Plant Pipeline (EIA-860M Generators)

Planned, under-construction, canceled, operating and retired US power generators from EIA's monthly Form EIA-860M: owner, plant, state, county, technology, fuel, MW, status and expected online date. Monitor new and changed projects.

Pricing

from $4.00 / 1,000 results

Rating

0.0

(0)

Developer

Frank Gilroy

Frank Gilroy

Maintained by Community

Actor stats

0

Bookmarked

2

Total users

1

Monthly active users

3 days ago

Last modified

Features

Limited permissions

Share

What does US Power Plant Pipeline do?

It reads the U.S. Energy Information Administration's Preliminary Monthly Electric Generator Inventory (Form EIA-860M) and gives you every US generator of 1 MW or more as a tidy dataset row: who owns it, which plant it belongs to, where it is (state, county, coordinates, balancing authority), what it runs on, how many megawatts it has, and where it stands in its life cycle.

The most useful part is the new-build pipeline: the Planned list (proposed, permitted and under-construction projects with their expected online month) and the Canceled or Postponed list. Existing (Operating) and Retired generators are available too. Turn on Only new or changed generators and schedule the Actor monthly to receive just the projects that appeared or moved since your last run.

Who uses it:

  • Pipeline tracking. Watch solar, wind, battery, gas and nuclear projects move from "planned" to "under construction" to "testing", state by state.
  • Developer and siting research. See which companies are building where, at what size, and which grid region (balancing authority) they connect to.
  • Supply-chain and EPC lead lists. Projects with regulatory approval but not yet under construction are the ones about to buy transformers, panels, turbines and construction services.
  • Energy analysts and journalists. Capacity additions and retirements by technology and month, with the official EIA status wording kept intact.

No login, API key or proxy is needed: the source is a public EIA download.

How to use it

  1. Pick the inventories you want. planned is the default; add canceled, operating or retired as needed.
  2. Narrow it down with states (two-letter codes), technologies (for example Batteries, Solar Photovoltaic, Onshore Wind), energy source codes (SUN, WND, MWH, NG, NUC and so on), a minimum MW, EIA status codes, or a planned online window (YYYY-MM).
  3. Run it. For monitoring, schedule a run each month with Only new or changed generators switched on and Fail the run if nothing is found switched off.

EIA status codes for planned units: P planned, approvals not started · L approvals pending · T approvals received · U under construction, up to half done · V under construction, more than half done · TS built and testing · OT other. Operating units use OP, SB, OA and OS. This Actor labels retired rows RE and canceled or postponed rows CN.

Input example

Large Texas and Arizona batteries that are under construction or testing and due online during 2027:

{
"inventories": ["planned"],
"states": ["TX", "AZ"],
"technologies": ["Batteries"],
"minMw": 50,
"statusCodes": ["U", "V", "TS"],
"plannedOperationFrom": "2027-01",
"plannedOperationTo": "2027-12",
"maxResults": 2000
}

Output

You get one row per generator (a single plant often has several). Download the dataset as JSON, CSV, Excel or XML, or pull it through the Apify API.

{
"id": "eia860m:68334-EVCRK",
"inventory": "planned",
"status": "(V) Under construction, more than 50 percent complete",
"statusCode": "V",
"entityId": 66742,
"entityName": "Evans Creek Energy Storage LLC",
"plantId": 68334,
"plantName": "Evans Creek Energy Storage Project",
"generatorId": "EVCRK",
"state": "TX",
"county": "Val Verde",
"balancingAuthority": "ERCO",
"sector": "IPP Non-CHP",
"technology": "Batteries",
"energySource": "MWH",
"primeMover": "BA",
"nameplateMw": 103,
"summerMw": 103,
"winterMw": 103,
"plannedOperationDate": "2026-09",
"operatingDate": null,
"retirementDate": null,
"latitude": 29.746007,
"longitude": -101.1406,
"dataMonth": "2026-09",
"releaseDate": "2026-10-23",
"sourceUrl": "https://www.eia.gov/electricity/data/eia860m/xls/september_generator2026.xlsx",
"attribution": "Source: U.S. Energy Information Administration, Preliminary Monthly Electric Generator Inventory (Form EIA-860M), October 2026",
"scrapedAt": "2026-11-13T10:24:31.512Z"
}
FieldMeaning
ideia860m: + EIA plant ID + generator ID. Stable from month to month
inventoryplanned, canceled, operating or retired (the EIA sheet the row came from)
status, statusCodeEIA's status wording and its short code (see the list above)
entityId, entityNameThe reporting owner or operator (a company, utility, co-op or public body)
plantId, plantName, generatorIdEIA identifiers for the plant and the unit
balancingAuthorityGrid balancing area code, e.g. ERCO, PJM, MISO, CISO
sectorEIA sector, e.g. Electric Utility, IPP Non-CHP, Industrial CHP
technology, energySource, primeMoverEIA technology description, energy source code and prime mover code
nameplateMw, summerMw, winterMwNameplate and net seasonal capacity in megawatts
plannedOperationDateExpected online month (YYYY-MM), planned units only
operatingDateMonth the unit started operating (operating and retired units)
retirementDateMonth retired; for operating units, the planned retirement month when one is reported
dataMonth, releaseDateThe month the inventory describes and the day EIA published it
sourceUrl, attributionThe exact EIA file used and a ready-made credit line

Get a daily alert

Turn this Actor into a monthly list of new or changed projects (EIA publishes monthly, so a monthly schedule is enough) in a few minutes:

  1. Set your filters in the Input tab and turn on Only new or changed generators. Turn Fail the run if nothing is found off.
  2. Click Save as a new task, then open the task and choose Schedule. Pick a cron time (for example every day at 07:00).
  3. Open the task's Integrations tab and add one of:
    • Slack: posts a message to a channel when a run finishes.
    • Email: sends a notification with a link to the results.
    • Google Sheets: appends the new generators as rows after each run.
    • Webhook: sends an HTTP POST to your own URL when the run succeeds; read the new rows from the run's default dataset.
  4. The first run returns everything that matches your filters. Every later run returns only generators it has not returned before, so you pay only for what is new.

The list of already returned IDs is kept in a key-value store in your own Apify account. Delete that store if you want a fresh start.

How much does it cost?

Pricing is pay-per-event: $4.00 per 1,000 generators returned ($0.004 per row), plus Apify's small standard Actor-start fee. Compute and storage are included.

  • Every planned 100 MW-plus project in Texas (about 350 rows) costs roughly $1.40.
  • The whole national pipeline, planned plus canceled (about 4,100 rows), costs about $16.40.
  • A monthly monitor that reports around 300 new or changed projects costs about $1.20 a month.
  • The full inventory of all four lists (about 40,000 rows) costs about $160.

Runs that match nothing are not charged for results. If you set a maximum cost per run, the Actor stops neatly once it reaches it.

Paste any of these into the Input tab's JSON view and press Start.

Texas solar and battery projects, 50 MW and up

{
"inventories": [
"planned"
],
"states": [
"TX"
],
"technologies": [
"Solar Photovoltaic",
"Batteries"
],
"minMw": 50,
"maxResults": 200
}

Batteries of 100 MW or more due online in 2027

{
"inventories": [
"planned"
],
"technologies": [
"Batteries"
],
"minMw": 100,
"plannedOperationFrom": "2027-01",
"plannedOperationTo": "2027-12",
"maxResults": 200
}

Projects under construction or testing

{
"inventories": [
"planned"
],
"statusCodes": [
"U",
"V",
"TS"
],
"minMw": 100,
"maxResults": 200
}

Planned wind projects, 50 MW and up

{
"inventories": [
"planned"
],
"energySources": [
"WND"
],
"minMw": 50,
"maxResults": 200
}

Monthly monitor: only new or changed projects

{
"inventories": [
"planned"
],
"minMw": 50,
"onlyNew": true,
"failOnEmpty": false,
"maxResults": 500
}

How it compares

Checked against the public Store pages and input schemas on 2026-11-15. Rivals change; check their pages before you buy.

This Actornexgenwatch/eia-860m-monthly-generator-inventoryafkdigital/us-power-plant-expansion-retirement-pipelinemaydit/eia-power-project-monitor
SourceEIA-860MEIA-860MEIA-860M and EIA-860EIA reporting
InventoriesPlanned, canceled or postponed, operating, retiredStatus categoriesPlanned, operating, retiring, retiredPlanned generators
FiltersState, technology, energy source, minimum MW, EIA status, planned online windowState, technology, energy source, balancing authority, owner, statusState, energy source, minimum MW, operator, status, planned datesKeywords, states, technologies, minimum MW, plant IDs
New or changed onlyYes (onlyNew)Not in its inputNot in its inputYes (onlyChanges)
Balancing authority and coordinates in outputYesYesNot statedNot stated
Price (pay per event)$4.00 per 1,000 generators$0.02 per run plus per-record fee (see its page)$9.00 per 1,000 generatorssee its page

Pick this one for a monthly new-build watch with grid region and coordinates on every row. Pick another if you need to filter by owner name or balancing authority up front.

FAQ

How often does the source update? EIA publishes the 860M inventory monthly. Schedule the Actor monthly.

What counts as the "pipeline"? The planned list: proposed, permitted, under-construction and testing projects, plus canceled or postponed ones.

Can I get only projects that changed? Yes. Turn on Only new or changed generators.

Do I get coordinates and the grid region? Yes: latitude, longitude, county and balancing authority on every row.

Does it cover units under 1 MW? No. EIA-860M lists generators of 1 MW or more.

Are owner contact details included? No. Entity names are kept; named people are removed.

Output sample

Three real rows from a run on 2026-11-15, trimmed to the main fields:

[
{
"id": "eia860m:68334-EVCRK",
"inventory": "planned",
"status": "(V) Under construction, more than 50 percent complete",
"statusCode": "V",
"entityId": 66742,
"entityName": "Evans Creek Energy Storage LLC",
"plantId": 68334,
"plantName": "Evans Creek Energy Storage Project",
"generatorId": "EVCRK",
"state": "TX",
"county": "Val Verde",
"balancingAuthority": "ERCO",
"sector": "IPP Non-CHP",
"technology": "Batteries",
"energySource": "MWH",
"primeMover": "BA",
"nameplateMw": 103,
"summerMw": 103,
"winterMw": 103,
"plannedOperationDate": "2026-09",
"operatingDate": null,
"retirementDate": null,
"latitude": 29.746007,
"longitude": -101.1406,
"dataMonth": "2026-09",
"releaseDate": "2026-10-23",
"sourceUrl": "https://www.eia.gov/electricity/data/eia860m/xls/september_generator2026.xlsx",
"attribution": "Source: U.S. Energy Information Administration, Preliminary Monthly Electric Generator Inventory (Form EIA-860M), October 2026",
"scrapedAt": "2026-11-15T05:25:48.291Z"
},
{
"id": "eia860m:64672-BLUJS",
"inventory": "planned",
"status": "(TS) Construction complete, but not yet in commercial operation",
"statusCode": "TS",
"entityId": 64266,
"entityName": "Blue Jay Solar I, LLC",
"plantId": 64672,
"plantName": "Blue Jay Solar I, LLC",
"generatorId": "BLUJS",
"state": "TX",
"county": "Grimes",
"balancingAuthority": "ERCO",
"sector": "IPP Non-CHP",
"technology": "Solar Photovoltaic",
"energySource": "SUN",
"primeMover": "PV",
"nameplateMw": 210,
"summerMw": 210,
"winterMw": 210,
"plannedOperationDate": "2026-10",
"operatingDate": null,
"retirementDate": null,
"latitude": 30.705329,
"longitude": -96.06983,
"dataMonth": "2026-09",
"releaseDate": "2026-10-23",
"sourceUrl": "https://www.eia.gov/electricity/data/eia860m/xls/september_generator2026.xlsx",
"attribution": "Source: U.S. Energy Information Administration, Preliminary Monthly Electric Generator Inventory (Form EIA-860M), October 2026",
"scrapedAt": "2026-11-15T05:25:48.372Z"
},
{
"id": "eia860m:65028-ROSES",
"inventory": "planned",
"status": "(TS) Construction complete, but not yet in commercial operation",
"statusCode": "TS",
"entityId": 64438,
"entityName": "Enel Green Power Roseland Solar, LLC",
"plantId": 65028,
"plantName": "Roseland Solar Project, LLC",
"generatorId": "ROSES",
"state": "TX",
"county": "Falls",
"balancingAuthority": "ERCO",
"sector": "IPP Non-CHP",
"technology": "Solar Photovoltaic",
"energySource": "SUN",
"primeMover": "PV",
"nameplateMw": 500,
"summerMw": 500,
"winterMw": 500,
"plannedOperationDate": "2026-10",
"operatingDate": null,
"retirementDate": null,
"latitude": 31.461242,
"longitude": -96.82493,
"dataMonth": "2026-09",
"releaseDate": "2026-10-23",
"sourceUrl": "https://www.eia.gov/electricity/data/eia860m/xls/september_generator2026.xlsx",
"attribution": "Source: U.S. Energy Information Administration, Preliminary Monthly Electric Generator Inventory (Form EIA-860M), October 2026",
"scrapedAt": "2026-11-15T05:25:48.429Z"
}
]

Limits and notes

  • Monthly data. EIA publishes EIA-860M once a month, roughly four weeks after the month it covers. Running more often than that returns the same file; a monthly schedule is enough.
  • Preliminary figures. These are EIA's early numbers. Planned dates slip, capacities get revised, and the annual Form EIA-860 later supersedes them. Treat plannedOperationDate as the owner's latest estimate.
  • 1 MW threshold. Plants with less than 1 MW of total nameplate capacity are not in the source.
  • Owner names of individuals removed. A few generator owners are individuals. When an owner name looks like a person's name and carries no company or place word, entityName is left empty; entityId remains so you can still join on it. Plant names are facility names (some honour historical figures) and are kept as EIA publishes them.
  • Respects EIA's rules. The Actor fetches only the current file linked from EIA's EIA-860M page, never the archive folders that EIA's robots.txt excludes, sends at most one request per second, and backs off when the server is busy.
  • Memory. The default 1 GB is sized for reading all four lists at once (about 600 MB at peak). 512 MB is enough for the planned and canceled lists alone.

Sources and licences

Data: U.S. Energy Information Administration, Form EIA-860M, https://www.eia.gov/electricity/data/eia860m/. EIA's copyright and reuse page (https://www.eia.gov/about/copyrights_reuse.php) says: "U.S. government publications are in the public domain and are not subject to copyright protection. You may use and/or distribute any of our data, files, databases, reports, graphs, charts, and other information products that are on our website". EIA asks that reusers credit it as the source and give the date of the publication; every row carries an attribution line and a releaseDate for this.

This Actor is independent and is not affiliated with, endorsed by or sponsored by the U.S. Energy Information Administration.

Queue Ledger is a free point-in-time archive of US power-project pipelines (EIA-860M, CAISO, SPP), useful for seeing how a project's status changed between monthly releases.

Guides and free samples

Background on the data source, with working examples:

All of them use the same pay-per-event pricing, need no login and can be scheduled with an only-new option.

Support

Published by Frank Gilroy. Questions get an answer within 7 days. Open an issue on the Issues tab if a value looks off or you need another field.