Minneapolis Building Permits Scraper — Contractor Leads avatar

Minneapolis Building Permits Scraper — Contractor Leads

Pricing

$4.00 / 1,000 permits

Go to Apify Store
Minneapolis Building Permits Scraper — Contractor Leads

Minneapolis Building Permits Scraper — Contractor Leads

Daily Minneapolis building permits from official open data: contractor name & address, permit value, work type, address, parcel ID, lat/long. Roofing, solar, HVAC & remodel leads.

Pricing

$4.00 / 1,000 permits

Rating

0.0

(0)

Developer

Parallel Studio

Parallel Studio

Maintained by Community

Actor stats

0

Bookmarked

2

Total users

1

Monthly active users

a day ago

Last modified

Share

Get fresh building permits from the City of Minneapolis as clean, analysis-ready JSON/CSV/Excel: permit number, issue date, address, parcel ID (APN), neighborhood, ward, latitude/longitude, permit & work type, valuation, fees, new/eliminated dwelling units, job description and the contractor/applicant name and address.

Who uses it

  • Roofers, HVAC, solar, window, landscaping and remodel companies building lead lists
  • Building-material suppliers and lenders prospecting active contractors
  • Investors tracking teardowns, new construction and additions
  • Journalists and researchers following local development

Input

FieldMeaning
daysBackPermits issued in the last N days (default 14). Use 3650 to reach back to the start of the city's records (Dec 2016)
minValueMinimum permit valuation in $
permitTypese.g. Res, Comm (empty = all)
workTypese.g. New, Addition, Remodel, Misc, Wreck
keywordText in the job description, e.g. roof, solar, deck
maxItemsCap on results

Example input

{
"daysBack": 7,
"minValue": 10000,
"permitTypes": [
"Res"
],
"workTypes": [],
"keyword": "roof",
"maxItems": 200
}

Example output (real record from the 2026-10-12 cloud run)

{
"city": "Minneapolis",
"permitNumber": "BLDG1204564",
"issueDate": "2026-10-09T18:18:46.000Z",
"completeDate": null,
"status": "Issued",
"milestone": "Final Inspection",
"address": "410 THOMAS AVE S",
"parcelId": "2902924130003",
"neighborhood": "Bryn - Mawr",
"ward": "7",
"latitude": 44.97316,
"longitude": -93.31382,
"permitType": "Res",
"occupancyType": "SFD",
"workType": "Misc",
"value": 13000,
"fees": 337.3,
"dwellingUnitsNew": 0,
"dwellingUnitsEliminated": 0,
"description": "Remove shingles on house & detached garage, inspect decking, install ice & water shield to code, install new shingles & roof components",
"contractor": "JTR Roofing Inc",
"contractorAddress": "11200 Stillwater Blvd N #106B, Lake Elmo",
"source": "City of Minneapolis Open Data (CCS Permits)"
}

Data quality & history (measured, not promised)

We checked the official feed on 2026-10-13 so you know what you get before you run it:

  • History back to December 1, 2016: about 409,000 Minneapolis permits in total, roughly 40,000 to 47,000 a year (42,698 in 2017, 47,056 in 2024, 39,308 in 2025). Set daysBack high and raise maxItems to pull multi-year history for market studies or contractor track records.
  • Volume right now: 11,124 permits issued in the 90 days to Oct 11, 2026, about 120 a day.
  • Field completeness across the 2,000 most recent permits:
FieldFilled
Contractor/applicant name & address, parcel ID, latitude/longitude, permit value, fees, permit & work type, status100%
Neighborhood, ward99.6%
Job description99.5%
Occupancy type (SFD, duplex, commercial...)75.8%
Dwelling units new/eliminated (the city leaves it blank on the rest; we output 0)42.5%
Complete date (mostly blank because the permit is still open)8.1%
  • Straight from the source: every row comes from the City of Minneapolis CCS Permits feed at run time, sorted newest first, with the same permit number the city uses, so you can de-duplicate daily runs on permitNumber.

FAQ

How do I get only new permits every day? Schedule the actor daily with daysBack: 1 (or 2 for overlap) and de-duplicate on permitNumber.

Can I get roofing (or solar, HVAC, deck) leads only? Use keyword, e.g. roof, solar, furnace, deck. It matches the job description text.

Does it cover St. Paul or the suburbs? Not yet. This actor covers the City of Minneapolis only.

Pricing

Pay per event: $0.004 per permit returned. No start fee, no proxies needed, runs in seconds. Schedule it daily with daysBack: 1 for a steady lead feed.

Data source & legality

Official public open data published by the City of Minneapolis (Open Data portal). No login, no personal account data. Always follow local rules for marketing outreach.