Building Permits Scraper: Contractor, Solar & Roofing Leads avatar

Building Permits Scraper: Contractor, Solar & Roofing Leads

Pricing

$2.00 / 1,000 permit delivereds

Go to Apify Store
Building Permits Scraper: Contractor, Solar & Roofing Leads

Building Permits Scraper: Contractor, Solar & Roofing Leads

US building permits from city and county open-data portals (Chicago, NYC, Los Angeles, Austin, Seattle and 13 more): address, valuation, contractor name, phone and licence, owner. Construction leads by trade (solar, roofing, HVAC, pool), date and value. Export to JSON, CSV or Excel, or via API.

Pricing

$2.00 / 1,000 permit delivereds

Rating

0.0

(0)

Developer

Steady Scrape

Steady Scrape

Maintained by Community

Actor stats

0

Bookmarked

2

Total users

1

Monthly active users

5 days ago

Last modified

Features

Limited permissions

Share

Building Permits Scraper: contractor, solar, roofing and HVAC leads

Building Permits Scraper collects US building permits from the open-data portals of 18 cities and counties, newest first: Chicago, New York City, Los Angeles, San Francisco, Seattle, Austin, Dallas, Orlando, Mesa, Cincinnati, Baton Rouge, New Orleans, Montgomery County (MD), Marin County, Norfolk, San Diego County, Cambridge (MA) and Calgary (Canada). Each permit comes as one clean row with the same columns everywhere: permit number, type, issue date, address, coordinates, job valuation, work description, contractor company, person, phone, email and licence (where the city publishes them), owner and applicant. Filter by trade (solar, roofing, HVAC, electrical, plumbing, pool, new construction, demolition, remodel), issue date, minimum valuation, residential or commercial, or a keyword. Export to JSON, CSV or Excel, or use it via API.

The data comes from each city's own Socrata open-data API (data.cityofchicago.org, data.cityofnewyork.us, data.lacity.org…). No login, no key, no proxy, no browser. Every row names the portal, the dataset and the licence it was published under. This Actor is an independent tool. It is not affiliated with or endorsed by any of these cities or counties.

What can this building permits scraper do?

  • Solar installer leads: who just got a solar permit, at which address, installed by whom (Austin, Orlando, San Diego County, New Orleans, Chicago and Cambridge name the installer; San Francisco and Los Angeles list solar permits without one).
  • Roofing and HVAC leads: re-roofs, furnaces, heat pumps and AC units permitted this week, with the contractor's phone in Austin, Mesa, Orlando and San Diego County.
  • Contractor intelligence: which contractors pull the most permits in a city, of what value, for which trades. Sell to them, recruit them, or watch competitors.
  • Real estate and construction signals: new homes, additions and demolitions by address and valuation, for investors, suppliers, lenders and insurers.
  • Market research: permit volume and value by trade, city and month.

How to get building permits

  1. Pick the cities and counties.
  2. Choose a window: issued in the last N days (7 by default in the form), or set exact dates.
  3. Optionally narrow it down: trades, keyword, minimum valuation, residential or commercial, only permits that name a contractor.
  4. Run it. Each city's newest permits come first.

Trades are read in the permit's type and in its work description, so a re-roof filed as a plain building permit is still found as roofing. Each row lists every trade it was tagged with in tradeTags. A long description can carry several (a new home's description often names its plumbing, electrical and mechanical work).

Input

{
"jurisdictions": ["austin", "chicago", "mesa"],
"issuedWithinDays": 14,
"trades": ["roofing", "hvac"],
"propertyUse": "residential",
"minValuation": 5000,
"onlyWithContractor": true,
"maxResultsPerJurisdiction": 200
}
fieldwhat it does
jurisdictionsThe cities and counties to read (keys such as chicago, new-york-city, los-angeles, montgomery-county-md, calgary).
issuedWithinDaysPermits issued from this many days ago up to today (default 30).
issuedFrom, issuedToExact first and last issue days, YYYY-MM-DD. They replace the window above.
tradesOnly these trades: solar, roofing, hvac, electrical, plumbing, pool, new_construction, demolition, addition_remodel.
keywordOnly permits whose description, type or any name (owner, contractor, applicant) contains this text: tesla, generac, ADU.
minValuationOnly permits whose declared job value is at least this much.
propertyUseany, residential or commercial.
onlyWithContractorLeave out permits that name no contractor.
maxResultsPerJurisdiction, maxResultsStop a city, or the whole run, after this many permits (0 for no limit).
includeRawRecordAdd every column the portal publishes, as published, in raw.

Output example

One permit of Mesa, AZ (the raw record left out):

{
"rowType": "permit",
"jurisdiction": "mesa",
"jurisdictionName": "Mesa, AZ",
"permitNumber": "PMT26-13237",
"permitType": "Residential Permit",
"permitSubtype": "Single Family (Attached)",
"tradeTags": ["hvac", "electrical", "plumbing", "pool", "new_construction", "demolition"],
"propertyUse": "residential",
"permitStatus": "Issued",
"appliedDate": "2026-07-20",
"issuedDate": "2026-11-10",
"address": "5861 E MONTARA PL",
"city": "Mesa",
"latitude": 33.460367,
"longitude": -111.70358,
"description": "New single-story custom home with 3063 SF livable and 1335 SF non-livable…",
"valuation": 656269.56,
"currency": "USD",
"squareFeet": 4398,
"contractorBusiness": "Kirch Construction, Inc.",
"contractorLicense": "159499",
"contractorPhone": "(480) 962-4483",
"contractorEmail": "tkcon123@yahoo.com",
"contractorAddress": "1872 E. Third St, Tempe, AZ, 85215",
"applicantName": "THOMAS AND JULIA KIRCH FAMILY REVOCABLE TRUST",
"recordApiUrl": "https://citydata.mesaaz.gov/resource/dzpk-hxfb.json?permit_number=PMT26-13237",
"datasetUrl": "https://citydata.mesaaz.gov/d/dzpk-hxfb",
"license": "City of Mesa open data terms of use",
"attribution": "City of Mesa Development Services"
}

Output fields

fieldmeaning
rowType, statuspermit and ok for a permit; a free status row is described below the table.
jurisdiction, jurisdictionName, state, countryThe city or county key (as in the input), its name, its state or province, and US or CA.
permitNumber, permitType, permitSubtype, workClass, permitStatusThe permit as the city names it.
tradeTagsThe trades read in its type and description.
propertyUseresidential, commercial, or null when the city gives no class.
appliedDate, issuedDate, finaledDateYYYY-MM-DD.
address, city, zipCode, latitude, longitudeWhere the work is.
description, valuation, currency, squareFeet, housingUnitsThe work, its declared value (USD, CAD for Calgary), area and units added.
contractorBusiness, contractorName, contractorLicense, contractorPhone, contractorEmail, contractorAddressThe contractor, as far as the city publishes it.
ownerName, ownerAddress, applicantName, applicantBusiness, applicantPhoneThe owner and the applicant.
contactsEvery contact the city lists, with its role (Chicago lists up to 15 per permit: owner, architect, each trade's contractor).
permitPageUrlThe city's own page for the permit (Austin, Seattle, Cincinnati and others).
recordApiUrl, datasetName, datasetUrl, license, attributionWhere the row came from and under which licence.
rawThe original record, when includeRawRecord is on.
scrapedAtWhen the row was read (UTC).

A city or county with nothing to deliver gets one free status row (rowType: "status") with the reason: no_results (no permit for the filters), source_unavailable (the portal did not answer), source_changed (the portal changed its format), filter_unsupported (a dataset cannot answer a filter), scan_limit (the scan maximum was spent before a permit passed the filters), spending_limit (your maximum cost per run paid for no permit). Each names the city or county in query and explains itself in reason. Those rows are never charged.

What each portal publishes

city or countycontractorvaluation
Chicago, ILcompany, city, state, ZIP, and every typed contactyes
New York City, NYcompany, person, licence, addressyes
Los Angeles, CAnonebuilding permits only (electrical and mechanical have none)
San Francisco, CAnoneyes
Seattle, WAcompany, rarelyyes
Austin, TXcompany, person, phone, addressbuilding permits (trade permits rarely declare one)
Dallas, TXnone since its new permit system (late 2026)rarely
Orlando, FLcompany, qualifier, licence class, phone, addressyes
Mesa, AZcompany, licence, phone, email, addressyes
Cincinnati, OHcompanyyes
Baton Rouge, LAcompany, addressyes
New Orleans, LAcompanyyes
Montgomery County, MDnoneyes
Marin County, CAcompanyyes
Norfolk, VAnoneyes
San Diego County, CAcompany, phone, addressbuilding permits
Cambridge, MAcompany, licenceyes
Calgary, ABbuilderyes (CAD)

How much does it cost?

US$0.002 per permit delivered (US$2 per 1,000 permits). Free status rows are never charged, and there is no start fee. Set a maximum cost per run in Apify and the run stops at exactly the permits it pays for.

Limits

  • Data is as fresh as each city publishes it: most portals update daily. Montgomery County publishes its permits about two weeks late.
  • New York City publishes no residential or commercial class, so with Property use set its permits are left out (a free row says how many).
  • Coverage is the 18 jurisdictions listed. Other cities publish permits in other formats and are not read yet; open an issue to ask for one.
  • The trade, keyword and valuation filters are asked of the portal and checked again on every permit, so every row matches what you asked.
  • A portal that is down is retried with growing waits; if it still does not answer, the run goes on with the others and a free row says so.

Building permits are public records, and every portal read here publishes them as open data for reuse, under the licence named in each row (public domain, PDDL, ODbL, or the city's open-data terms). Some permits name people (owners, applicants, contractors). If you use them for marketing, follow the rules that apply to you: CAN-SPAM, the TCPA and Do Not Call lists for phone outreach, and state privacy laws. Read each portal's terms before republishing the data, and credit the city where its licence asks for attribution (attribution in each row).