Go to example tasks

High-rise buildings and tower cranes over 150 ft (US)

Returns new building and crane projects 150 ft or taller anywhere in the US from FAA Form 7460-1 filings: high-rises, hospitals, offices and the tower cranes that build them. Each row has height, location, start date and the developer or contractor contact. For crane rental, steel, concrete, facade, elevator and MEP companies.

Try for free
FAA Tall Structure Filings: Tower, Crane & Building Leads + AI
FAA Tall Structure Filings: Tower, Crane & Building Leads + AIwickedome/faa-obstruction-filings
Filed
Structure / site
Type
Filings
+12 fields
Text
Number
Boolean
List
Object

Input

Structure types:buildings+1
Minimum height (ft above ground):150
Lookback days:7
Only new projects:true

Output fields

Filed
Structure / site
Type
Filings
Max height (ft)
City
County
State
Project type
Summary (AI)
Sponsor
Contact
Phone
E-mail
Work starts
FAA case

How it works

Sign up on Apify or log in

The FAA Tall Structure Filings: Tower, Crane & Building Leads + AI Actor is ready to run with the inputs already set for "High-rise buildings and tower cranes over 150 ft (US)". Sign up or log in and you'll land in Apify Console with a copy of this exact task.

Start the "High-rise buildings and tower cranes over 150 ft (US)" task

The FAA Tall Structure Filings: Tower, Crane & Building Leads + AI Actor will start running based on the input automatically. You can also change all the input fields, like structure types, minimum height (ft above ground), and more, to match your specific use case.

Receive the "High-rise buildings and tower cranes over 150 ft (US)" output

Monitor the progress in real time. You will be notified as soon as your dataset is complete and ready for review. Each result includes data such as filed, structure / site, type, and more.

Integrate into your workflow

The final output is delivered in JSON, CSV, or Excel format, ready to be plugged into your workflow. You can also run the "High-rise buildings and tower cranes over 150 ft (US)" task via API.

Image

Integrate "High-rise buildings and tower cranes over 150 ft (US)" into your workflow

Connect "High-rise buildings and tower cranes over 150 ft (US)" with 100+ integrations, or run it via API or MCP.

Webhook

Webhook

n8n

n8n

Make

Make

Zapier

Zapier

Airbyte

Airbyte

Keboola

Keboola

IFTTT

IFTTT

Hubspot

Hubspot

GDrive

GDrive

Gmail

Gmail

Apify MCP

Apify MCP

GitHub

GitHub

Slack

Slack

LangChain

LangChain

LlamaIndex

LlamaIndex

Flowise

Flowise

Pinecone

Pinecone

OpenAI

OpenAI

Mastra

Mastra

Clay

Clay

Frequently asked questions

One row per project: structure type, height, city, county, state, planned start date, the sponsor's company, contact name, phone and e-mail, a link to the FAA case, plus AI tags for project type and which trades should call.

The FAA's public OE/AAA system. Anyone building a structure over 200 ft, or near an airport, including temporary cranes, must file Form 7460-1 at least 45 days before construction starts.

$0.04 per project on the Apify Free and Starter plans ($0.03 on Scale, $0.025 on Business), plus $0.01 per project with AI tags. There is no monthly fee.

Schedule the high-rise and crane task weekly in Apify Console. Only new is on, so each run returns just the projects it has not returned before. Send them to Google Sheets, a CRM, Slack or e-mail with an Apify integration.