New wind farm and solar projects (FAA filings)
Returns wind turbine, met tower and solar projects filed with the FAA in the last 30 days, grouped into one row per project with the number of turbines, maximum height, location, start date and the developer's contact. Wind farms often file months before construction. For crane, civil, electrical, foundation and equipment companies chasing energy work.
Input
Output fields
Sign up on Apify or log in
The FAA Tall Structure Filings: Tower, Crane & Building Leads + AI Actor is ready to run with the inputs already set for "New wind farm and solar projects (FAA filings)". Sign up or log in and you'll land in Apify Console with a copy of this exact task.
Start the "New wind farm and solar projects (FAA filings)" task
The FAA Tall Structure Filings: Tower, Crane & Building Leads + AI Actor will start running based on the input automatically. You can also change all the input fields, like structure types, lookback days, and more, to match your specific use case.
Receive the "New wind farm and solar projects (FAA filings)" output
Monitor the progress in real time. You will be notified as soon as your dataset is complete and ready for review. Each result includes data such as filed, structure / site, type, and more.
Integrate into your workflow
The final output is delivered in JSON, CSV, or Excel format, ready to be plugged into your workflow. You can also run the "New wind farm and solar projects (FAA filings)" task via API.

Integrate "New wind farm and solar projects (FAA filings)" into your workflow
Connect "New wind farm and solar projects (FAA filings)" with 100+ integrations, or run it via API or MCP.
Webhook
n8n
Make
Zapier
Airbyte
Keboola
IFTTT
Hubspot
GDrive
Gmail
Apify MCP
GitHub
Slack
LangChain
LlamaIndex
Flowise
Pinecone
OpenAI
Mastra
Clay
One row per project: structure type, height, city, county, state, planned start date, the sponsor's company, contact name, phone and e-mail, a link to the FAA case, plus AI tags for project type and which trades should call.
The FAA's public OE/AAA system. Anyone building a structure over 200 ft, or near an airport, including temporary cranes, must file Form 7460-1 at least 45 days before construction starts.
$0.04 per project on the Apify Free and Starter plans ($0.03 on Scale, $0.025 on Business), plus $0.01 per project with AI tags. There is no monthly fee.
Schedule the wind and solar task weekly in Apify Console. Only new is on, so each run returns just the projects it has not returned before. Send them to Google Sheets, a CRM, Slack or e-mail with an Apify integration.