GB Grid Connection Queue Tracker: TEC and DNO Changes avatar

GB Grid Connection Queue Tracker: TEC and DNO Changes

Pricing

Pay per event

Go to Apify Store
GB Grid Connection Queue Tracker: TEC and DNO Changes

GB Grid Connection Queue Tracker: TEC and DNO Changes

Every move in Great Britain's grid connection queue: new projects, MW changes, connection dates that slip, status and Gate changes, withdrawals. TEC and DNO registers in one schema, with before and after values. Monthly MW reports by technology or substation.

Pricing

Pay per event

Rating

0.0

(0)

Developer

Arjun Shankar

Arjun Shankar

Maintained by Community

Actor stats

0

Bookmarked

2

Total users

1

Monthly active users

6 days ago

Last modified

Share

See every move in Great Britain's grid connection queue: new projects, capacity changes, connection dates that slip or jump, status and Gate changes, and withdrawals.

The transmission (TEC) register and the distribution networks' Embedded Capacity Registers come back in one schema, so a battery project in the TEC register and a solar farm on a DNO register look the same to your code. Each change carries the values before and after. Change history on the longest-running registers goes back to September 2023.

Run it with the default input: 10 recent changes.

Who uses it

  • Battery, solar and wind developers watch the substations they care about and see the day a rival's connection date moves ahead of theirs.
  • Grid consultants track queue position and Gate status for clients without diffing register downloads twice a week.
  • Land agents see which projects near their clients hold a connection offer, and when it changes.
  • Investors and analysts count queued, connected and withdrawn MW by technology, grid supply point, planning authority or licence area, month by month.

Input

FieldWhat it does
modechanges (default), snapshot (the current pipeline) or report (monthly totals)
sinceChanges published since a date, YYYY-MM-DD. Empty means the last 31 days
sinceLastRuntrue returns only changes newer than your last run. Best for schedules
changeTypesnew, capacity_changed, connection_date_moved, status_changed, gate_changed, withdrawn
sourcesPick registers: neso_tec, neso_interconnector, neso_embedded, npg_ecr, ssen_ecr
technologies, minMwe.g. battery, solar, wind_onshore; minimum headline MW
gate, licenceAreas, statusesGate 1 or 2 (TEC), licence areas such as SSEN-SHEPD, project status
month, groupBy, scopeFor report: month, grouping (technology, gsp, lpa, licence_area) and transmission, distribution or all
maxItemsCaps the rows, and so the cost

Output

Each change carries change_type, change_date, source, project_name, customer_name, technology, mw, status, licence_area, gsp, postcode_district, lpa, before, after, project_id and data_as_of. Pipeline rows add connection_date, gate, substation, MW import, export and storage figures, a planning reference where one matches, and coordinates where the register gives a location.

A real change from a DNO register, August 2026, trimmed:

{
"change_type": "connection_date_moved",
"change_date": "2026-08-07",
"source": "ssen_ecr",
"project_name": "CLACHAIG WIND FARM",
"customer_name": "RWE RENEWABLES UK ONSHORE WIND LTD",
"technology": "wind_onshore",
"mw": 52.8,
"licence_area": "SSEN-SHEPD",
"gsp": "Carradale",
"before": { "connection_date": "2026-04-30" },
"after": { "connection_date": "2028-09-29" },
"data_as_of": "2026-10-06"
}

A report row gives projects and MW by status for one group, such as all battery projects.

Pricing

Pay per result. See the Pricing tab for current rates; maxItems caps the rows and so the cost. A run that finds nothing charges nothing per item.

FAQ

Which registers does it cover? The transmission TEC, interconnector and embedded registers, plus the distribution registers for the UK Power Networks, SP Energy Networks, Electricity North West, Northern Powergrid and SSEN areas.

How fresh is it? The transmission registers update twice a week and the DNO registers monthly. The actor checks every source daily, and new releases reach it within about 6 hours.

Is a moved connection date a forecast? No. It is what the register published. The actor reports the change, not whether the project will connect.

Built on open data used under each publisher's open licence, including CC BY 4.0 and the Open Government Licence v3.0. Every run carries the full attribution in OUTPUT_SUMMARY. Runs record anonymous usage counts only, never your inputs or results.