Utility Commission Filings Tracker (22 States) + AI Summaries
Pricing
from $15.00 / 1,000 filings
Utility Commission Filings Tracker (22 States) + AI Summaries
Returns new utility commission (PUC/PSC) docket filings from 22 US states in one schema: docket, filer, date, PDF link and topic tags for data centers and large loads, rate cases, interconnection, IRPs and tariffs. Optional AI summaries with MW, dollars and deadlines. No API key or login needed.
Pricing
from $15.00 / 1,000 filings
Rating
0.0
(0)
Developer
Ahmed Eid
Maintained by CommunityActor stats
0
Bookmarked
2
Total users
1
Monthly active users
6 days ago
Last modified
Categories
Features
Share
Utility Commission Filings Tracker (PUC Dockets)
Get a daily feed of new public utility commission (PUC/PSC) docket filings from 22 US states in one clean schema. Every filing comes with its docket title, filer, industry, a direct link to the PDF and topic tags, plus an optional AI summary of the document itself.
About 700 filings per business day across: Alabama, Arizona, California, Colorado, Florida, Georgia, Kentucky, Louisiana, Maryland, Michigan, Missouri, Nevada, New York, Ohio, Oklahoma, Oregon, Pennsylvania, South Carolina, Texas, Utah, Virginia and Washington.
No API key, login or proxy needed. Run it in Apify Console, on a schedule, through the Apify API, or as a tool for AI agents (Claude, ChatGPT, n8n, Make) through the Apify MCP server. You pay only for the filings it returns.
Built for people who track utility regulation for a living:
- Data center and large-load developers. Watch large-load tariffs, interconnection rulemakings and utility applications across ERCOT, PJM states (VA, PA, OH, MD), the Southeast (GA, FL, SC, AL), the West (CA, AZ, NV, OR, WA, CO, UT) and more.
- Energy analysts, consultants and investors. Follow rate cases, IRPs, CCNs, transmission lines and riders without checking 22 commission websites every morning.
- Solar, wind and storage developers. Catch generation interconnection and exempt wholesale generator filings.
- Lawyers, lobbyists and journalists. Get alerted when anything is filed in the dockets you care about.
What you get
| Field | Example |
|---|---|
state | TX |
docketNumber | 60332 |
docketTitle | APPLICATION OF SOUTHWESTERN PUBLIC SERVICE COMPANY FOR APPROVAL OF LARGE LOAD … |
documentTitle | SOUTHWESTERN PUBLIC SERVICE COMPANY'S PETITION FOR REVIEW … |
filedDate | 2026-11-13 |
filedBy / filedFor / company | filer and utility names |
industry | electric, gas, water/sewer, telecom … |
caseType, itemType | where the commission provides them |
topics | ["data_center_large_load", "tariff"] |
matchedTerms | ["large load", "tariff"], which explains why it was tagged |
documentUrl | direct PDF or document link |
docketUrl | docket page, where the commission has one |
Topic tags
data_center_large_load: data centers, large loads, hyperscalers, crypto mining, co-location, behind-the-meterrate_case: base rate cases, rate changes, revenue requirements, biennial or triennial reviewsgeneration_interconnection: solar, wind, battery storage, interconnection agreements, EWGsresource_planning_and_transmission: IRPs, CCN/CPCN, transmission lines, kV, substations, new generationtariff: tariffs and riders
AI summaries (optional)
Turn on aiSummaries and the Actor reads each filing's document and adds an aiSummary object. It reads the first 40 pages of a PDF, a Word file, or every PDF and Word file in a ZIP (Georgia serves multi-file filings, such as a large-load contract with its public summary, as one ZIP).
| Field | Example |
|---|---|
summary | 2–3 plain-English sentences: who filed what, asking for what, and why it matters |
filingPurpose | Rebuttal testimony, Final order approving tariff … |
keyFacts | up to 5 concrete facts |
dollarAmounts | ["$412M revenue increase"] |
capacityMW | ["300 MW data center load in Amarillo"] |
deadlines | hearing dates, comment deadlines, effective dates |
dataCenterRelevant | true / false |
summaryCoverage tells you what was read, e.g. all 7 pages, pages 1-40 of 212 or all 5 files in a ZIP. Scanned image-only PDFs can't be summarized; those rows get a summaryError instead and aren't charged for a summary. Use maxSummaries to set how many summaries you want (newest filings first). Filings that can't be summarized (Maryland and Ohio documents, scanned PDFs) don't count toward it.
Sample output
A real filing from 2026-11-10, with an AI summary:
{"state": "TX","commission": "Public Utility Commission of Texas","filingId": "TX-59399-81","docketNumber": "59399","docketTitle": "JOINT APPLICATION OF COMANCHE PEAK POWER COMPANY LLC AND AMAZON DATA SERVICES, INC. FOR APPROVAL OF A NET METERING ARRANGEMENT","itemType": "BR","industry": "electric","filedDate": "2026-11-10","filedBy": "ONCOR ELECTRIC DELIVERY COMPANY LLC","documentTitle": "ONCOR ELECTRIC DELIVERY COMPANY LLC'S INITIAL BRIEF","documentUrl": "https://interchange.puc.texas.gov/search/documents/?controlNumber=59399&itemNumber=81","docketUrl": "https://interchange.puc.texas.gov/search/filings/?ControlNumber=59399","topics": ["data_center_large_load"],"matchedTerms": ["amazon data services"],"isPublicComment": false,"aiSummary": {"summary": "Oncor Electric Delivery Company LLC filed an initial brief supporting approval of the proposed net metering arrangement between Comanche Peak Power Company LLC and Amazon Data Services, Inc. Oncor states that the protection-scheme concern has been resolved, but asks the Commission to determine whether the proposed configuration complies with PURA § 39.170 or clarify Oncor's responsibilities and any equipment or operational control needed to curtail Amazon's large load during a firm load shed event.","filingPurpose": "Initial brief supporting approval with request for curtailment guidance","keyFacts": ["The application concerns a net metering arrangement between the Comanche Peak nuclear generation facility and Amazon's co-located large load.","Oncor supports approval of the proposed net metering arrangement.","Under the proposed configuration, Oncor would be unable to directly curtail or disconnect the large load without also severing the connection to Comanche Peak unless additional equipment or operational control is provided."],"dollarAmounts": [],"capacityMW": ["Approximately 1,200 MW Amazon co-located large load", "Approximately 2,400 MW generation loss in a complete dual-unit trip"],"deadlines": ["November 10, 2026: deadline for parties to file initial briefs"],"dataCenterRelevant": true},"summaryCoverage": "all 7 pages","summaryModel": "gpt-6-luna","scrapedAt": "2026-11-15T09:21:20.657Z"}
keyFacts and deadlines are shortened here; the real row had five facts and two deadlines.
How to use it
Daily monitor (recommended). Schedule the Actor daily with lookbackDays: 3 and onlyNew: true. Each run returns only filings you haven't seen yet. You can connect the dataset to Slack, email, Google Sheets or a webhook with Apify integrations.
{ "states": ["TX", "VA", "GA", "OH", "PA"], "topics": ["data_center_large_load", "rate_case"], "lookbackDays": 3, "onlyNew": true }
Backfill. Set dateFrom and dateTo. See Backfills for ranges longer than a month.
Keyword watch. keywords: ["Oncor", "battery"] keeps filings that mention any of them.
Backfills: past filings
You can load up to 2 years of history in one run, for example to seed a database or study how a rate case unfolded.
{ "states": ["TX", "GA"], "topics": ["rate_case"], "dateFrom": "2025-01-01", "dateTo": "2025-12-31", "maxItems": 20000 }
- The range is read one month at a time, newest month first.
maxItemsstops the run once it's reached, so you get the most recent history first and never pay for more than you asked for. - Use
states,topicsandkeywordsto narrow it. All 22 states together file roughly 15,000 documents a month. - Each month takes a few minutes with all 22 states, less with fewer states. Raise the run timeout in Run options for long backfills (for example 1 hour for a year of all states).
- If Apify moves the run to another server mid-way, it resumes where it stopped without pushing (or charging) a filing twice.
- For more than 2 years, split it into several runs.
Notes
- The data comes from each commission's public e-filing system. Filings marked confidential, protected or rejected are skipped, because they have no public document.
- Public comments are dropped by default: comments sent in by individual residents, and bulk public-comment memoranda (often hundreds per day in big cases). Set
excludePublicComments: falseto keep them. - If one commission's site is down, the other states still return, and the failure is listed in the
RUN_SUMMARYrecord. - Coverage notes:
- Oregon only lists new applications, advice filings and reports, not every document in ongoing dockets.
- Kentucky covers open cases only.
- Pennsylvania publishes documents a few days after it receives them.
- Maryland and Ohio documents can't be downloaded automatically, so those filings come without AI summaries (they still have links and metadata).
- Maryland's site blocks direct requests from cloud servers, so Maryland requests go through your account's Apify Proxy (Apify's shared datacenter proxies, which the free plan includes too; Maryland pages are small). If your account has no proxy access, the Actor tries a direct connection and lists any failure in
RUN_SUMMARY.
- Not covered yet: Indiana, Illinois, North Carolina, Minnesota and New Jersey. Their systems block automated access or have no date search. Open an issue to request another state.
Diagnostics
To catch problems early, each run sends its author two short anonymous records to a private dataset: one when it starts and one when it ends. They contain:
- the run's status (succeeded, partly failed, failed, aborted), duration, memory and build number, and how many rows it returned
- the error message if something broke, with web addresses shortened to the site and path
- the shape of the input: which states were requested, the lookback and range length, how many topics, industries and keywords were set (not what they were), maxItems, and whether AI summaries were on
They never contain your keywords, place names, dates, results or account details. The run and user IDs are one-way hashed, so they can only be used to pair the two records and count distinct users. Sending can't slow down or break a run. To turn it off, set Send anonymous diagnostics (sendDiagnostics) to false.
Pricing
Pay per filing returned, plus a separate charge per successful AI summary when aiSummaries is on. There's no monthly fee, and platform usage is included. Filings removed by your filters are never charged. Bigger Apify plans pay less per filing:
| Event | Apify Free and Starter | Scale | Business and up |
|---|---|---|---|
| Filing returned | $0.025 | $0.02 | $0.015 |
| AI summary | $0.04 | $0.035 | $0.03 |
For example, a daily data-center watch that returns 40 filings a week and summarizes 20 of them costs $1.80 a week on the Free or Starter plan.
Use topic, keyword or industry filters, maxItems and maxSummaries to control cost.
Apify Free plan: each run writes up to 10 AI summaries (newest filings first). Filings after that come back with a summaryError that says why and aren't charged for a summary. Paid Apify plans have no limit beyond your own maxSummaries.