US Power Grid Interconnection Queues (CAISO, ERCOT, NYISO, SPP)
Pricing
Pay per event
US Power Grid Interconnection Queues (CAISO, ERCOT, NYISO, SPP)
Every generation, storage and large-load (data center) interconnection request from CAISO, ERCOT, NYISO and SPP public queue reports, normalized into one schema: MW, fuel, county, POI, status, queue date and proposed COD.
Pricing
Pay per event
Rating
0.0
(0)
Developer
Walter Washburn
Maintained by CommunityActor stats
0
Bookmarked
3
Total users
2
Monthly active users
2 months ago
Last modified
Features
Share
US Power Grid Interconnection Queue Scraper - CAISO, ERCOT, NYISO, SPP
One clean dataset of every solar, wind, battery storage, gas and large-load (data center) interconnection request from four US grid operators' public queue reports - normalised to a single schema: MW, fuel category, state, county, point of interconnection, developer, status, queue date and proposed commercial operation date.
Each ISO publishes its queue in a different spreadsheet layout with different codes. This Actor reads the latest file from each, decodes it, and gives you rows you can filter and join.
What's included
| ISO | Source file | What you get |
|---|---|---|
| CAISO (California) | Public Queue Report (xlsx) | Active, completed and withdrawn projects; fuel mix, net MW, POI, utility, study process, IA status, current on-line date |
| ERCOT (Texas) | Latest monthly GIS Report (xlsx) | Large and small generators with developer (interconnecting entity), POI, study phase, projected COD, construction start; inactive projects |
| NYISO (New York) | Interconnection Queue (xlsx) | Queue, cluster projects, large-load requests (data centers, chip fabs, hydrogen), withdrawn and in-service; status codes decoded to text |
| SPP (14 central states) | Active queue CSV | Queue number, cluster, state, county, capacity, service type, status, cause of delay |
Codes are translated using each ISO's own legend (e.g. NYISO CR = Storage + Solar, status 12 = Under Construction; ERCOT OTH/BA = Battery Storage). Every row also gets a common fuelCategory: Solar, Solar + Storage, Wind, Offshore Wind, Storage, Gas, Nuclear, Hydro, Transmission, Load and so on.
Who uses it?
- EPC contractors, substation and transmission builders, equipment vendors (transformers, switchgear, racking, BESS containers) - find projects heading toward construction, by county.
- Renewable developers and land teams - competitive intelligence and POI congestion.
- Data-center site selectors and utilities - see large-load requests and nearby generation.
- Investors, analysts, consultants - queue statistics by fuel, state, status and year.
Input examples
Default - active projects of 50 MW or more in all four ISOs:
{ "isos": ["CAISO", "ERCOT", "NYISO", "SPP"], "minMw": 50 }
Data-center and industrial large-load requests (NYISO):
{ "isos": ["NYISO"], "fuelCategories": ["Load"] }
Wind and storage in Kansas and Oklahoma (SPP):
{ "isos": ["SPP"], "states": ["KS", "OK"], "fuelCategories": ["Wind", "Storage"] }
Everything including withdrawn and completed history, with every original column:
{ "statusGroups": ["active", "completed", "withdrawn"], "includeRaw": true }
Output example
{"iso": "CAISO","queueId": "32","projectName": "TULE WIND","developer": null,"fuel": "Wind Turbine + Battery","fuelCategory": "Wind + Storage","capacityMw": 193.8,"state": "CA","county": "SAN DIEGO","poi": "Boulevard East Substation 138 kV","utility": "SDGE","status": "ACTIVE","statusGroup": "active","requestType": "generation","studyPhase": "Serial LGIP","iaStatus": "Executed","queueDate": "2004-05-24","proposedCod": "2030-10-31","sourceUrl": "https://www.caiso.com/documents/publicqueuereport.xlsx"}
A NYISO large-load row looks like: "projectName": "North Country Data Center", "fuel": "Load (DAT-CM)", "capacityMw": 435, "county": "St. Lawrence", "status": "12 - Under Construction".
| Field | Meaning |
|---|---|
iso, queueId | Grid operator and its queue/INR/GI number |
projectName, developer | Where the ISO publishes them (CAISO has no developer column; SPP publishes neither) |
fuel, technology, fuelCategory | ISO wording plus a common category |
capacityMw | Net MW to grid (CAISO), summer MW (NYISO), capacity (ERCOT/SPP), peak load MW for load requests |
state, county, poi, utility, zone | Location and interconnection point |
status, statusGroup | ISO status text and active / completed / withdrawn |
requestType | generation or load |
studyPhase, iaStatus | Study stage and interconnection agreement |
queueDate, proposedCod, withdrawnDate, constructionStart | Key dates (ISO-8601 where the ISO gives a full date) |
raw | Optional: every original column |
Pricing
Pay-per-event:
| Event | Price |
|---|---|
| Actor start | $0.01 per run |
queue-project | $3.00 per 1,000 projects |
Examples: all NYISO large-load requests (~50 rows) ~ $0.17. All active projects over 50 MW in four ISOs (~2,700 rows) ~ $8. Complete history of all four ISOs (~7,500 rows) ~ $22.
FAQ
Is this legal? Yes. All four files are public reports that CAISO, ERCOT, NYISO and SPP publish on their websites for anyone to download, without login. The Actor downloads each file once per run. It contains company and project data, not personal data. Treat the ISO as the authoritative source for any filing or investment decision.
Why not PJM, MISO and ISO-NE? PJM's queue export requires an authenticated API key and MISO's queue API sits behind a bot challenge; we don't bypass either. ISO-NE is on the roadmap. Tell us in Issues which you need most.
How fresh is it? Every run downloads the current file. CAISO and SPP update frequently, NYISO roughly monthly, ERCOT publishes the GIS Report monthly (the Actor picks the newest).
Why are some NYISO proposed CODs like "06-2028"? NYISO publishes month-year only; we pass it through unchanged rather than invent a day.
An ISO changed its spreadsheet and a column is empty? The Actor finds columns by header name, not position, so most layout changes are absorbed; if a sheet disappears the run logs a warning and still returns the other ISOs. Report it in Issues and we'll patch it.