Configure MCP server with FERC interconnection filings from Federal Register
Add the configuration above to your project's .mcp.json file for Claude Code, then run /mcp in Claude Code to sign in to Apify. It connects to the hosted Apify MCP server with the FERC interconnection filings from Federal Register Actor already loaded. Clients without OAuth support can authenticate with an Authorization: Bearer header carrying an API token from API & Integrations in Apify Console.
For other MCP clients, get a client-specific configuration with the FERC interconnection filings from Federal Register Actor preconfigured at https://mcp.apify.com/?tools=fetch-actor-details,zentrafoundry/solar-interconnection-queue-watcher.
You can connect to the Apify MCP server using an MCP client that supports Streamable HTTP.
If you want to learn more about our Apify MCP implementation, check out our MCP documentation. To learn more about the Model Context Protocol in general, refer to the official MCP documentation or read our blog post.