Concrete mix design by ACI 211.1 from plain text (water, cement, sand, stone and air per yd³ or m³, w/c, batch weights), and concrete volume for slabs, footings, columns and post holes with the bags or ready-mix to order.
Pricing
Pay per event
Rating
0.0
(0)
Developer
Jumble Mog
Maintained by CommunityActor stats
0
Bookmarked
2
Total users
1
Monthly active users
5 days ago
Last modified
Categories
Features
Share
Design a concrete mix by ACI 211.1, or work out how much concrete a slab, footing, column or post holes take and how many bags to buy, from one line of text. Ask 4000 psi driveway concrete, 3/4 in stone, 4 in slump or 10x12 ft slab 4 in thick and you get back:
- The mix per cubic yard and per cubic meter: water, cement, fly ash, sand and stone weights, the water-cement ratio, the air content, cement sacks and the ratio by weight, proportioned by the ACI 211.1 absolute volume method.
- The right strength margin and exposure rules: the required average strength f'cr of ACI 318 when there's no test record, entrained air and the w/c limit for freeze-thaw and de-icing salts (ACI 318 Table 19.3.2.1).
- Batch weights corrected for wet sand and stone, and the totals for the whole pour (
for 10 cubic yards). - The concrete volume of a slab, footing, wall, column or post holes (minus the posts), with waste, in ft³, yd³ and m³, the 40, 60 and 80 lb premix bags or 25 kg bags it takes, and the ready-mix to order.
- A chart and a Markdown report with every number.
It's made for:
- Homeowners and contractors pricing a slab, patio, footing or fence posts.
- Engineers, ready-mix and precast producers, testing labs and students who want a starting mix to trial-batch.
- AI agents, estimating tools and construction apps that need concrete quantities or proportions they can cite.

How to use it
- Write Mixes and pours, one per entry. The form has examples.
- Optionally change the Default waste added to pours (10%).
- Click Start. Each request is a row in the results, with its summary, chart and report.
What you can write
| You write | It means |
|---|---|
4000 psi, 30 MPa, C25/30 | The specified 28-day strength f'c |
3/4 in stone, 20 mm aggregate, #57 stone | The nominal maximum aggregate size (default 3/4 in) |
4 in slump, 100 mm slump | The slump (default 4 in) |
air entrained, non-air, 6% air | Air entrainment (on by default for exterior concrete) |
driveway, de-icing salts, parking garage | Severe freeze-thaw exposure (F2: w/c ≤ 0.45) |
patio, sidewalk, exterior | Moderate freeze-thaw exposure (F1: w/c ≤ 0.55) |
footing, interior, basement floor | No freeze-thaw exposure |
FM 2.6, rodded 105 pcf | Sand fineness modulus and stone dry-rodded unit weight (defaults 2.70 and 100 lb/ft³) |
20% fly ash, w/c 0.45 | Fly ash share of the binder; a w/c limit |
sand moisture 5%, gravel moisture 1% | Moisture-corrected batch weights |
no overdesign | Proportion for f'c itself instead of f'cr |
for 10 cubic yards, 8 m3 | Batch totals for a volume |
10x12 ft slab 4 in thick, 400 sq ft 4 in thick, 3 x 4 m slab, 100 mm thick | A slab, patio or footing |
footing 20 ft long 16 in wide 8 in deep | A footing or wall |
column 12 in diameter 10 ft tall x 4 | Round columns or piers |
12 post holes 10 in diameter 3 ft deep with 4x4 posts | Post holes, with the posts subtracted |
5% waste, no waste | Waste on a pour (default 10%) |
A pour with a strength (20x24 ft garage slab 4 in thick, 4000 psi) also gets the mix and the batch for the whole pour. The same as an object: {"shape": "footing", "length": "40 ft", "width": "20 in", "depth": "10 in", "strength": 3000} or {"strengthMpa": 30, "size": 0.75, "slump": 3, "moistureFine": 5, "volumeM3": 8}.
Examples
3500 psi, non-air-entrained, 1-1/2 in stone, 3 to 4 in slump, FM 2.8, no overdesign→ the ACI 211.1 worked example: w/c 0.62, 300 lb water, 480 lb cement, 1,321 lb sand and 1,917 lb stone per yd³, 1% air.4000 psi driveway concrete, 3/4 in stone, 4 in slump→ air-entrained for de-icing salts: f'cr 5,200 psi, w/c 0.38, 6% air, 794 lb cement per yd³, with a warning that ACI 318 asks for 4,500 psi in class F2.30 MPa, 20 mm aggregate, 75 mm slump, sand moisture 5%, for 8 m3→ per m³ 202 kg water, 457 kg cement, 676 kg sand, 1,009 kg stone, with wet-sand batch weights and 3,656 kg of cement for 8 m³.10x12 ft slab 4 in thick→ 1.63 yd³ with 10% waste: 74 bags of 80 lb mix, or 1.75 yd³ of ready-mix.12 post holes 10 in diameter 3 ft deep with 4x4 posts→ 0.675 yd³: 31 bags of 80 lb mix.
How-to examples
These are examples from Examples above, written as complete inputs; the result lines are from their runs.
How to design a concrete mix by ACI 211.1
{"requests": ["3500 psi, non-air-entrained, 1-1/2 in stone, 3 to 4 in slump, FM 2.8, no overdesign"]}
Result: The ACI 211.1 worked example: w/c 0.62, 300 lb water, 480 lb cement, 1,321 lb sand and 1,917 lb stone per yd³, 1% air.
How to calculate concrete for a slab
{"requests": ["10x12 ft slab 4 in thick"]}
Result: 1.63 yd³ with 10% waste: 74 bags of 80 lb mix, or 1.75 yd³ of ready-mix.
How to count bags of concrete for post holes
{"requests": ["12 post holes 10 in diameter 3 ft deep with 4x4 posts"]}
Result: 0.675 yd³: 31 bags of 80 lb mix.
How to let an AI agent work out a concrete mix or pour
Add this Actor to the Apify MCP server with https://mcp.apify.com/?tools=jumblemog/concrete-mix-calculator. The agent writes the job the way a builder says it ("4000 psi driveway concrete, 3/4 in stone") and passes on the mix weights, volume and bag counts instead of guessing them.
FAQ
What can it calculate? ACI 211.1 mix designs (water, cement, sand and stone per cubic yard or cubic metre) and pour volumes for slabs, post holes and other shapes, with premix bag counts and ready-mix yards.
Does it work in metric? Yes. Write 30 MPa, 20 mm aggregate, 75 mm slump and the mix comes back in kg per m³.
How much waste does it add? 10% on pours unless the request or the waste field says otherwise.
Can I pour straight from the mix design? Treat it as a starting point. ACI 211.1 expects trial batches to adjust the water for slump and yield.
How many can I run at once? Up to 200 mixes or pours per run, each as a line of text or an object. A request that can't be computed isn't billed.
Does it work with Zapier, Make or n8n? Yes. Call the Actor with its Apify app or an HTTP request and pass the results on.
Input
| Field | What it is |
|---|---|
requests | Mixes or pours, as lines of text or objects (up to 200 per run) |
waste | Waste % on pours when a request doesn't say (default 10) |
charts | Draw a chart for each request (default on) |
Output
One dataset item per request, also saved together in the run's OUTPUT record:
{"request": 1, "status": "ok", "type": "mix", "title": "4,000 psi concrete mix","summary": "4,000 psi air-entrained mix, 3/4 in stone, 4 in slump: w/c 0.38, per yd³ 305 water, 794 cement, 1,035 sand, 1,701 stone (lb/yd³), 6% air.","mix": {"specifiedStrength": 4000, "designStrength": 5200, "designBasis": "f'c + 1,200 psi", "airEntrained": true,"exposure": "severe", "maxAggregate": "3/4 in", "slump": 4, "wc": 0.384, "airPercent": 6,"perYd3": {"water": 305, "cement": 794.3, "sand": 1035, "coarse": 1701},"perM3Kg": {"water": 180.9, "cement": 471.2, "sand": 613.8, "coarse": 1009},"unitWeight": 142.0, "cementSacksPerYd3": 8.45, "ratioByWeight": "1 : 1.30 : 2.14 (w/c 0.38)"},"batch": null,"units": {"mass": "lb", "volume": "ft³ / yd³ / m³", "length": "in", "strength": "psi"},"imageUrl": "https://api.apify.com/v2/key-value-stores/.../records/001-4-000-psi-concrete-mix.png"}
A pour has shape and volume (net and with-waste ft³, yd³ and m³, bags for 40, 60, 80 lb and 25 kg, readyMixYd3, readyMixM3, trucks), plus mix and batch when it has a strength. Every item has warnings, notes (every assumption and default), a Markdown report and links to the chart and report. A request that can't be computed has "status": "failed" and the reason in error, and isn't billed.
How it works
- Strength: without a test record, the mix is proportioned for f'cr = f'c + 1,000 psi (under 3,000), f'c + 1,200 psi (3,000-5,000) or 1.10 f'c + 700 psi (ACI 318 26.4.3).
- Water and air from ACI 211.1 Table 6.3.3 for the slump band and aggregate size; air by exposure for air-entrained concrete.
- w/c from Table 6.3.4(a), interpolated; the freeze-thaw limit or your limit if lower. Cement = water ÷ w/c (less the fly ash share).
- Stone = Table 6.3.6 dry-rodded volume (by size and sand FM) × 27 ft³ × unit weight. Sand fills the rest of the 27 ft³ by absolute volume, from the specific gravities.
- Moisture: wet sand and stone weigh more and carry free water, taken off the mixing water.
- Pours: length × width × thickness, π/4 × diameter² × height, or the hole minus the post; bags at 0.60 ft³ per 80 lb.
Pricing
You pay one low price per request, at the price shown on this page: a mix design, or a pour's volume (a pour with a strength counts as a mix). The chart and report are included. Requests that can't be computed are never charged. If you set a maximum cost per run, the Actor stops before a request that wouldn't fit.
Speed
A request takes milliseconds. A run through the API answers in about 10 seconds, including the cloud container starting.
Tips and limits
- A mix design is a starting point. ACI 211.1 expects trial batches to adjust the water for the slump and the yield; use your aggregates' test data for a closer first batch.
- Normal-weight concrete with water-reducing admixtures left out; high-strength concrete (design strengths past the table by more than 1,000 psi) needs ACI 211.4.
- Premix bag yields vary a little by brand; the counts round up.
- Limits: 200 requests per run.
For AI agents and developers
This Actor works with the Apify MCP server, so AI agents can call it as a tool. Pass requests as plain text and read summary, mix, volume and warnings. A direct API call that waits for the answer:
curl -X POST "https://api.apify.com/v2/acts/jumblemog~concrete-mix-calculator/run-sync-get-dataset-items?token=YOUR_TOKEN" \-H "Content-Type: application/json" \-d '{"requests": ["20x24 ft garage slab 4 in thick, 4000 psi", "8 post holes 12 in diameter 42 in deep with 6x6 posts"]}'
run-sync instead returns the run's OUTPUT: the status, the counts and every result as JSON.
In Python, with the apify-client package:
from apify_client import ApifyClientclient = ApifyClient("YOUR_TOKEN")run = client.actor("jumblemog/concrete-mix-calculator").call(run_input={"requests": [{"strength": 4500, "size": 1, "slump": 3, "exposure": "moderate", "volumeYd3": 40}],})for item in client.dataset(run["defaultDatasetId"]).iterate_items():print(item["summary"])
Credits
- Method: ACI 211.1-91 (reapproved 2009), Standard Practice for Selecting Proportions for Normal, Heavyweight, and Mass Concrete, and ACI 318-19 26.4.3 and Table 19.3.2.1. This Actor is not affiliated with the American Concrete Institute.
- Charts: Vega-Lite and vl-convert (BSD-3-Clause), with the Inter font (SIL Open Font License).