ERCOT Interconnection Queue Scraper
Texas grid generator interconnection queue from ERCOT's monthly report: project, fuel, MW, county, study and agreement dates, status.
Pricing
from $0.80 / 1,000 record scrapeds
Rating
0.0
(0)
Developer
BowTiedRaccoon
Maintained by CommunityActor stats
0
Bookmarked
2
Total users
1
Monthly active users
2 days ago
Last modified
Categories
Features
Share
Get the Texas grid's generator interconnection queue from ERCOT as a clean table. Returns about 2,000 projects per monthly report: queue ID, fuel, capacity in MW, county, developer, study milestones, projected COD and status.
ERCOT Interconnection Queue Scraper Features
- Returns every large and small generator project ERCOT tracks, with its INR queue number.
- Filters by fuel type: solar, wind, battery storage, gas, nuclear, coal, biomass, hydro.
- Separates active projects from inactive ones and from projects cancelled during the report month.
- Carries the full milestone trail: screening study, full interconnection study, interconnection agreement, energization.
- Reads up to 12 monthly reports in one run, so you can see how a project's status moved from month to month.
- Dates come back as
YYYY-MM-DDand capacity as a plain number. No spreadsheet cleanup, which is the point.
Who Uses ERCOT Queue Data?
- Energy developers — Check who else is queued at the substation you are eyeing.
- Battery storage investors — Track the storage pipeline by county and by CDR zone, and see which projects already hold an interconnection agreement.
- Utilities and transmission planners — Feed projected COD and capacity into load and resource models, or at least a spreadsheet that is not copied out of a PDF.
- Analysts and journalists — Count what is actually being built in Texas against what is merely requested.
- Lenders and equity researchers — Screen counterparties by study phase and financial security status.
How ERCOT Interconnection Queue Scraper Works
- Pick a fuel type, a status, and how many monthly reports to read. All three are optional.
- The scraper reads ERCOT's published Generator Interconnection Status report for each month you ask for.
- Each project comes back as one row with its report month, so rows from different months line up and compare cleanly.
Input
{"maxItems": 100,"fuelTypes": ["battery"],"statuses": ["active"],"reportsBack": 1}
| Field | Type | Default | Description |
|---|---|---|---|
maxItems | integer | 100 | Maximum number of queue records to return. |
fuelTypes | array | all | Only projects of these fuel types: solar, wind, battery, gas, nuclear, coal, biomass, hydro, other. |
statuses | array | all | active, inactive, or cancelled (cancelled by the developer during the report month). |
reportsBack | integer | 1 | Monthly reports to read, newest first (1 to 12). One is the latest queue snapshot. |
ERCOT Interconnection Queue Output Fields
{"iso": "ERCOT","queue_id": "15INR0064b","project_name": "Harald (BearKat Wind B)","project_status": "active","size_category": "Large","study_phase": "SS Completed, FIS Completed, IA","fuel_type": "wind","technology": "WT","capacity_mw": 162.1,"county": "Glasscock","cdr_zone": "WEST","poi_name": "59903 Bearkat 345kV","interconnecting_entity": "McCrae Wind Energy II, LLC","screening_study_started": "2013-11-27","screening_study_complete": "2014-01-27","fis_requested": "2014-04-15","fis_approved": "2017-09-27","economic_study_required": false,"ia_signed": "2018-05-30","financial_security_posted": true,"projected_cod": "2026-12-03","approval_for_energization": "2020-02-10","approval_for_synchronization": "2020-05-12","report_month": "2026-10","report_posted": "2026-11-02"}
| Field | Type | Description |
|---|---|---|
iso | string | Grid operator, always ERCOT. |
queue_id | string | ERCOT interconnection request number (INR). |
project_name | string | Project name as ERCOT lists it. |
project_status | string | active, inactive or cancelled. |
size_category | string | Large or Small generator. |
study_phase | string | ERCOT study phase, for large generators. |
fuel_type | string | solar, wind, battery, gas, nuclear, coal, biomass, hydro or other. |
technology | string | ERCOT technology code, such as PV, WT or BA. |
capacity_mw | number | Capacity in MW. Repowering projects report net change and can be zero or negative. |
county | string | Texas county. |
cdr_zone | string | ERCOT CDR reporting zone. |
poi_name | string | Point of interconnection location. |
interconnecting_entity | string | Developer or entity requesting interconnection. |
screening_study_started | string | Screening study start date. Large generators only. |
screening_study_complete | string | Screening study completion date. Large generators only. |
fis_requested | string | Full interconnection study request date. Large generators only. |
fis_approved | string | Full interconnection study approval date. Large generators only. |
economic_study_required | boolean | Whether an economic study is required. Large generators only. |
ia_signed | string | Interconnection agreement signed date. |
financial_security_posted | boolean | Whether financial security has been posted. |
projected_cod | string | Projected commercial operation date. |
construction_start | string | Construction start date. Large generators only. |
construction_end | string | Construction end date. Large generators only. |
approval_for_energization | string | Date approved for energization. |
approval_for_synchronization | string | Date approved for synchronization. |
inactive_date | string | Date the project went inactive. Inactive projects only. |
cancelled_date | string | Date the developer cancelled. Cancelled projects only. |
report_month | string | Month of the ERCOT report the row comes from (YYYY-MM). |
report_posted | string | Date ERCOT posted that report. |
source_url | string | ERCOT's download link for that report. |
Inactive and cancelled rows carry the fields ERCOT publishes for them: name, fuel, capacity, county, size category and the status date.
FAQ
What data does the ERCOT Interconnection Queue Scraper return?
The ERCOT Interconnection Queue Scraper returns one row per generator project in ERCOT's monthly interconnection status report. That is roughly 1,750 active projects, plus the inactive list and the projects cancelled that month.
Does it include large-load interconnection requests?
No. The ERCOT Interconnection Queue Scraper covers generation only. ERCOT does not publish a large-load queue as a dataset, so there is nothing to collect there yet.
Can I filter by fuel type or county?
The ERCOT Interconnection Queue Scraper filters by fuel type and project status. County is a column on every row, so a county filter is one line in whatever you load the data into.
How current is the data?
The ERCOT Interconnection Queue Scraper reads ERCOT's latest published monthly report, which ERCOT posts in the first days of each month. Set reportsBack higher to read earlier months.
What do I put in to get the queue?
The ERCOT Interconnection Queue Scraper takes a fuel filter, a status filter and a month count, all optional apart from maxItems. The default is the latest monthly snapshot.
Need More Features?
Need extra fields, a different filter, or another grid operator? File an issue or get in touch.
Why Use ERCOT Interconnection Queue Scraper?
- Complete — Every project ERCOT reports, large and small, active, inactive and cancelled.
- Comparable across months — Each row carries its report month, so a status change between two reports is a diff, not an investigation.
- Analysis-ready — Typed dates, numeric MW and normalised fuel names, so the first thing you do with it is not cleaning it.