Construction Site Leads from EPA Stormwater Permits + AI Tags avatar

Construction Site Leads from EPA Stormwater Permits + AI Tags

Pricing

from $25.00 / 1,000 construction sites

Go to Apify Store
Construction Site Leads from EPA Stormwater Permits + AI Tags

Construction Site Leads from EPA Stormwater Permits + AI Tags

New construction sites from EPA stormwater permit filings: site, acres, start date and the operator's contact name, title, phone and e-mail, plus AI tags for project type and which trades should call. Utah, Illinois, South Dakota, New Mexico, Massachusetts, NH, DC, PR, tribal lands.

Pricing

from $25.00 / 1,000 construction sites

Rating

0.0

(0)

Developer

Ahmed Eid

Ahmed Eid

Maintained by Community

Actor stats

0

Bookmarked

2

Total users

1

Monthly active users

10 days ago

Last modified

Features

Limited permissions

Share

Construction Site Leads from EPA Stormwater Permits

Get new US construction sites the week they file for their stormwater permit, with the contractor or developer running the site and the direct contact for the project: name, title, phone and e-mail. AI tags add the project type, the type of company running it, which trades and suppliers should call, and a one-line summary.

Under the Clean Water Act, any construction site that disturbs an acre or more (or is part of a larger development) needs stormwater permit coverage before earthwork starts. The operator files a Notice of Intent (NOI) with the site address, acreage, planned start and end dates, and a point of contact. That makes NOIs one of the earliest public signals of new site work, often weeks before vertical construction, and the contact is usually the project manager, superintendent or SWPPP manager on the job.

This Actor reads the NOIs filed in EPA's NPDES eReporting Tool (NeT) for the Construction General Permit: about 8,700 new construction sites a year, roughly 170 a week.

No API key, login or proxy needed. Run it in Apify Console, on a schedule, through the Apify API, or as a tool for AI agents (Claude, ChatGPT, n8n, Make) through the Apify MCP server. You pay only for the sites it returns.

Where it covers

AreaWho issues the permitShare of new sites
UtahUtah DEQ (filed on EPA NeT)about half
IllinoisIllinois EPA (filed on EPA NeT)about 12%
New MexicoEPAabout 9%
MassachusettsEPAabout 8%
South DakotaSouth Dakota DANR (filed on EPA NeT)about 8%
New HampshireEPAabout 2%
Washington DC, Puerto Rico, Guam, US Virgin Islands and other territoriesEPAa few percent
Tribal lands in any state (e.g. Navajo Nation in AZ/NM/UT, reservations in MN, OK, WA, CO) and some federal facilitiesEPAa few percent

Other states run their own stormwater permit systems, so their sites are not included (except on tribal land or federal facilities).

Who uses it

  • Erosion control and SWPPP inspection companies. Every one of these sites needs BMPs, inspections and a stormwater plan, starting now.
  • Site services: portable toilets, dumpsters, temporary fencing, water trucks, equipment rental.
  • Trades and suppliers for site work: excavation and grading, aggregates, ready-mix, underground utilities, paving, surveying.
  • Homebuilder suppliers (framing, roofing, plumbing, HVAC, electrical) watching new subdivisions and lots, especially in fast-growing Utah.
  • Solar, utility and telecom contractors tracking new energy and line projects; insurance and bonding agents looking for active contractors.

What you get

One row per filing, ready for a spreadsheet or CRM:

FieldExample
submittedDate2026-11-13
siteNameWavetronix
siteStreet, siteCity, siteCounty, siteState, siteZip550 North 1750 West, Springville, Utah County, UT
latitude, longitude40.174236, -111.642303
acresDisturbed, sizeTier38, 25_to_100_acres
projectStart, projectEnd, projectDurationDays2026-11-01, 2027-11-01, 365
constructionTypesWhat the operator ticked: commercial, industrial, residential, single_family_residential, multifamily_residential, highway_road, utility, institutional, ...
operatorName, operator addressThe company (or person) in charge of the site
contactName, contactTitle, contactOrganizationThe operator's point of contact for the permit
contactPhone, contactPhoneAlt, contactEmailDirect phone and e-mail (almost every filing has an e-mail)
projectType (AI)commercial_retail_office
operatorType (AI)general_contractor
sellTo (AI)erosion_control_swppp, excavation_grading, concrete_ready_mix, equipment_rental, ...
leadSummary (AI)One plain-English sentence on what is being built, where and by whom
submissionType, status, coverageStatusNew / Change / Renewal / Reapplication / Termination; Approved, Active, OnHold, ...
npdesId, permitNumber, issuerPermit IDs and the issuing agency
copyOfRecordUrlThe official copy of the filing (PDF)

Sample output

One real filing from 2026-11-13. The contact's name, phone and e-mail are replaced here; the Actor returns them as EPA publishes them.

{
"noiId": "2315596",
"npdesId": "UTRC13857",
"permitNumber": "UTRC00000",
"issuer": "UT",
"submissionType": "New",
"status": "Approved",
"coverageStatus": "Active",
"submittedDate": "2026-11-13",
"effectiveDate": "2026-11-13",
"expirationDate": "2027-11-12",
"siteName": "Wavetronix",
"siteStreet": "550 North 1750 West",
"siteCity": "Springville",
"siteCounty": "Utah",
"siteState": "UT",
"siteZip": "84663",
"latitude": 40.174236,
"longitude": -111.642303,
"projectStart": "2026-11-01",
"projectEnd": "2027-11-01",
"projectDurationDays": 365,
"acresDisturbed": 38,
"sizeTier": "25_to_100_acres",
"constructionTypes": ["commercial"],
"operatorName": "Magleby Construction",
"operatorStreet": "1291 W Center St",
"operatorCity": "Lindon",
"operatorState": "UT",
"operatorZip": "84042",
"contactName": "<contact name>",
"contactTitle": "Project Manager",
"contactOrganization": "Magleby Construction",
"contactPhone": "<phone>",
"contactEmail": "<e-mail>",
"copyOfRecordUrl": "https://permitsearch.epa.gov/epermit-search/api/public/v1/cgp/download/form/2315596/attachment/pdf/2316923",
"projectType": "commercial_retail_office",
"operatorType": "general_contractor",
"sellTo": ["erosion_control_swppp", "excavation_grading", "surveying_engineering", "concrete_ready_mix", "equipment_rental", "portable_toilets_site_services", "dumpsters_waste", "temporary_fencing_security"],
"leadSummary": "Commercial construction for Wavetronix in Springville, Utah County, is being managed by Magleby Construction.",
"scrapedAt": "2026-11-15T18:35:19.088Z"
}

AI lead tags

With AI tags on (the default), each site gets:

  • Project type: single-family home, residential subdivision, multifamily, commercial (retail, office), industrial / warehouse, data center, solar / wind / battery, oil & gas, utility / pipeline / telecom, road / bridge / transportation, airport / military, school / government / institutional, healthcare, parks & recreation, water / wastewater, mining / quarry / landfill, agricultural, demolition / remediation, or other.
  • Operator type: homebuilder, general contractor, site / excavation contractor, developer or owner, utility company, energy developer, government agency, individual owner, or other.
  • Sells to: the trades and suppliers this site is a lead for, picked from erosion control / SWPPP, excavation & grading, surveying & engineering, concrete / ready-mix, aggregates, equipment rental, portable toilets & site services, dumpsters & waste, temporary fencing & security, underground utilities, paving & asphalt, framing & lumber, roofing, plumbing / HVAC / electrical, landscaping & irrigation, steel structures, solar & electrical installers, well & septic, and insurance & bonding.
  • Lead summary: one sentence, written only from the facts in the filing.

Use the Project types, Operator types and Sells to (your trade) filters to get only the leads that fit your business, for example every new subdivision in Utah run by a homebuilder. The tags are inferred from the site name, acreage, construction types and operator, so treat them as a strong hint. Contact phone numbers and e-mails are never sent to the AI.

How to use it

  1. Set the date range: Lookback days (default 7) or Date from / Date to. Lookback covers up to 31 days; a Date from / Date to range can cover up to 2 years (see Backfills).
  2. Narrow by States (UT, IL, NM, MA, SD, NH, DC, PR, ...), Counties, Cities, Minimum acres disturbed and Keywords.
  3. Optionally pick project types, operator types or your trade.
  4. Run it, then download the results as CSV, Excel or JSON, or send them to Google Sheets, a CRM or Slack with an Apify integration.

Example: weekly subdivision leads along the Wasatch Front for a framing supplier

{
"lookbackDays": 7,
"states": ["UT"],
"counties": ["Salt Lake", "Utah", "Davis", "Weber"],
"minAcres": 3,
"sellTo": ["framing_lumber"],
"operatorTypes": ["homebuilder", "developer_owner"],
"onlyNew": true,
"monitorId": "wasatch-framing",
"maxItems": 200
}

Example: every large site in New Mexico this month for an erosion control company

{
"lookbackDays": 31,
"states": ["NM"],
"minAcres": 5,
"maxItems": 500
}

Filing types

By default the Actor returns only New filings: new construction sites. You can add:

  • Change: an operator updated the site details or a new operator joined the site (for example a homebuilder taking over lots from the developer).
  • Renewal / Reapplication: sites still under construction when the permit renews.
  • Termination: the operator says the site is finished and stabilised. Useful for landscaping, final cleaning or follow-up work, and for tracking which contractors finish jobs.

Withdrawn and denied filings never became a permit and are skipped unless you turn on Include withdrawn and denied filings.

Backfills: past filings

Set Date from and Date to to pull older filings, up to 2 years per run, for example a list of every contractor that ran a 25-acre-plus site in Illinois last year. The Actor reads the range a month at a time, newest first, and stops as soon as it reaches Max sites (up to 50,000), so you pay only for the sites you get. Backfills are fast: the whole of Utah for a year takes a minute or two without AI tags.

If Apify moves the run to another server midway, it continues where it stopped and does not return or charge the same site twice.

Scheduled monitoring

Schedule the Actor daily or weekly with Only new sites on. Each Monitor ID remembers which filings it has already returned, so every run delivers only new leads. Use a different Monitor ID for each saved search. For a daily schedule, a 2–3 day lookback covers filings submitted late in the day or over weekends.

Notes

  • Data comes from EPA's public permit search at permitsearch.epa.gov (NPDES eReporting Tool, Construction General Permit). Dates are UTC.
  • Each operator on a site files its own NOI, so a big site can appear twice: once for the owner or developer and once for the general contractor. Both are useful contacts.
  • Single-lot homes are often under 1 acre; they file because they're part of a larger subdivision. Use Minimum acres disturbed to skip them.
  • acresDisturbed, projectStart and projectEnd are the operator's estimates at the time of filing.
  • Filings are returned newest first. A run summary (RUN_SUMMARY in the key-value store) shows how many filings were read and matched.
  • Contacts are business contacts published by EPA as public records. Follow the CAN-SPAM Act and other marketing rules when you reach out.

Diagnostics

To catch problems early, each run sends its author two short anonymous records to a private dataset: one when it starts and one when it ends. They contain:

  • the run's status (succeeded, partly failed, failed, aborted), duration, memory and build number, and how many rows it returned
  • the error message if something broke, with web addresses shortened to the site and path
  • the shape of the input: the lookback and range length, how many states, counties, cities, keywords, project types, operator types and trades were set (not which ones), maxItems, and whether AI tags were on

They never contain your keywords, place names, dates, results or account details. The run and user IDs are one-way hashed, so they can only be used to pair the two records and count distinct users. Sending can't slow down or break a run. To turn it off, set Send anonymous diagnostics (sendDiagnostics) to false.

Pricing

You pay per site returned, plus a small separate charge per site that carries AI tags when AI tags is on. There's no monthly fee, and platform usage is included. Filings removed by your filters are never charged. Bigger Apify plans pay less per site:

EventApify Free and StarterScaleBusiness and up
Site returned$0.04$0.03$0.025
AI tags on a site$0.01$0.008$0.006

For example, a weekly search that returns 25 new Utah sites with AI tags costs $1.25 a week on the Free or Starter plan.

Use the location, acreage, AI and keyword filters plus Max sites to control spend, and turn off AI tags if you only need the raw filings.

Apify Free plan: AI tags cover the first 40 sites of each run. Sites after that come back without tags (their aiError says why) and aren't charged for tags. With project type, operator type or trade filters, a run checks only the newest 40 sites that pass your other filters. Paid Apify plans have no limit.